Global Resource Options, Inc. DBA GroSol

How many solar installs has Global Resource Options, Inc. DBA GroSol done in California, and which license number is on its installs?

Global Resource Options, Inc. DBA GroSol has 111 residential solar installs interconnected in California, active in the records from 2009 through 2011 (May 6, 2009 to Mar 2, 2011), most of them in Alameda County (31), San Mateo County (17) and Santa Clara County (16). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
111
Last 24 months
0
Total capacity
428.9 kW DC
Median system size
3.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.9% of 111 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
other 1
First install
May 6, 2009
Latest install
Mar 2, 2011
Counties
11
Utilities
PGE 108, SCE 3
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
2009320
2010640
2011150
201200
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 111 interconnected installs with a tariff recorded (111) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0111100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Global Resource Options, Inc. DBA GroSol’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches Global Resource Options, Inc. DBA GroSol exactly.

Third-party owner named on its installsInstalls
SunRun OBS Owner I, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 108 of Global Resource Options, Inc. DBA GroSol’s 111 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (40, 37.0%) used modules recorded as Canadian Solar.

Across all years, 111 of Global Resource Options, Inc. DBA GroSol’s 111 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (43, 38.7%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar040
DelSolar021
Sanyo016
Evergreen Solar013
Yingli08
Inverter makerEnphase043
Motech Industries, Inc.042
SMA021
Fronius06

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 108 of 111 installs, inverters on 111. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (3 of 111 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Alameda31
San Mateo17
Santa Clara16
Contra Costa15
San Francisco12
Marin6
Napa6
Solano3
Orange2
Sonoma2
San Bernardino1

Top cities

CityInstalls
Oakland13
San Francisco12
Redwood City7
San Jose5
Berkeley4
Campbell4
Napa4
San Leandro4
Fremont3
Lafayette3
Livermore3
Walnut Creek3
Burlingame2
Danville2
Mill Valley2

Names as recorded by the utilities

The utilities recorded this installer under 12 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Global Resource Options, Inc. DBA GroSol89
Global Resource Options, Inc6
Global Resource Options Inc. dba groSola5
Global Resource Options, Inc. DBA GroSolar3
Global Resource Options dba Gro Solar In1
Global Resource Options inc dba Grosolar1
Global Resource Options inc, dba groSola1
Global Resource Options Inc, dba groSola1
Global Resource Options Inc. (dba gro So1
Global Resource Options, Inc d/b/a groSo1
Global Resource Options, Inc.1
Global Resource Options, Inc. dba groSol1

Common questions

Where does Global Resource Options, Inc. DBA GroSol install solar?

Its installs are spread across 11 counties. The most are in Alameda County (31 installs), followed by San Mateo County (17).

How often does Global Resource Options, Inc. DBA GroSol install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Global Resource Options, Inc. DBA GroSol installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 111 interconnected installs with a tariff recorded (111) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.