GOLDEN GATE GREEN-TECH DEVELOPERS

How many solar installs has GOLDEN GATE GREEN-TECH DEVELOPERS done in California, and which license number is on its installs?

GOLDEN GATE GREEN-TECH DEVELOPERS has 100 residential solar installs interconnected in California, active in the records from 2019 through 2025 (Oct 24, 2019 to Oct 9, 2025), most of them in San Francisco County (32), San Mateo County (26) and Alameda County (13). The license number recorded on most of its installs, 1024187, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
100
Last 24 months
7
Total capacity
661.6 kW DC
Median system size
5.9 kW DC
With battery storage
1.0% all time; 14.3% last 24 months
Third-party owned
0.0% of 100 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Oct 9, 2025
Ownership types recorded
none recorded
Median battery size
13.6 kWh (1 installs list a capacity)
First install
Oct 24, 2019
Latest install
Oct 9, 2025
Counties
12
Utilities
PGE 98, SCE 2
CSLB license
1024187

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201930
202090
202160
2022200
2023440
2024140
202541
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 100 interconnected installs (7.0% of the 100 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 14.3% of those include battery storage. The latest Net Billing Tariff install was approved Oct 9, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.09393.0%0 (0.0%)
Net Billing Tariff77.0%1 (14.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GOLDEN GATE GREEN-TECH DEVELOPERS’s installs. No residential system in the file lists a third-party owner name that matches GOLDEN GATE GREEN-TECH DEVELOPERS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 7 of GOLDEN GATE GREEN-TECH DEVELOPERS’ 7 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 85.7%) used modules recorded as Japan Solar (Infini Co. Ltd).

In the last 24 months, 7 of GOLDEN GATE GREEN-TECH DEVELOPERS’ 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 85.7%) used inverters recorded as SMA.

In the last 24 months, 1 of GOLDEN GATE GREEN-TECH DEVELOPERS’ 7 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as FranklinWH.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJapan Solar (Infini Co. Ltd)672
Panasonic12
Inverter makerSMA675
SolarEdge19
Battery makerFranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 88 of 100 installs, inverters on 100. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1024187Not found in the CSLB License Master file pulled Nov 4, 2026100

License numbers are the ones the utilities recorded on the interconnection applications (100 of 100 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list GOLDEN GATE GREEN-TECH DEVELOPERS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192021202220232024Total
City and County of San Francisco1024187372718340

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Francisco32
San Mateo26
Alameda13
Contra Costa9
Santa Clara8
Solano4
Marin2
San Joaquin2
Fresno1
Los Angeles1
Napa1
Riverside1

Top cities

CityInstalls
San Francisco32
Daly City5
San Bruno5
Castro Valley4
Oakland4
Pittsburg4
Millbrae3
Pacifica3
Richmond3
Burlingame2
Hayward2
San Jose2
San Leandro2
South San Francisco2
Stockton2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GOLDEN GATE GREEN-TECH DEVELOPERS100

Common questions

Where does GOLDEN GATE GREEN-TECH DEVELOPERS install solar?

Its installs are spread across 12 counties. The most are in San Francisco County (32 installs), followed by San Mateo County (26).

How often does GOLDEN GATE GREEN-TECH DEVELOPERS install batteries with solar?

1.0% of its interconnected solar installs include battery storage across all years, and 14.3% in the last 24 months (1 of 7).

How many GOLDEN GATE GREEN-TECH DEVELOPERS installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 100 interconnected installs (7.0% of the 100 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 14.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.