Golden Gate Solar

How many solar installs has Golden Gate Solar done in California, and which license number is on its installs?

Golden Gate Solar has 237 residential solar installs interconnected in California, active in the records from 2016 through 2022 (Oct 6, 2016 to Jul 12, 2022), most of them in San Francisco County (121), San Mateo County (39) and Contra Costa County (31). The license number recorded on most of its installs, 1024187, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
237
Last 24 months
0
Total capacity
1,068.1 kW DC
Median system size
4.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 237 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Oct 6, 2016
Latest install
Jul 12, 2022
Counties
11
Utilities
PGE 229, SCE 8
CSLB license
1024187, 930634

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016160
20171120
2018690
2019370
202000
202120
202210
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 237 interconnected installs with a tariff recorded (237) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02410.1%not counted
NEM 2.021389.9%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Golden Gate Solar’s installs. No residential system in the file lists a third-party owner name that matches Golden Gate Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 192 of Golden Gate Solar’s 237 installs name a module maker in the “Generator Manufacturer” fields, and most of those (122, 63.5%) used modules recorded as Japan Solar (Infini Co. Ltd).

Across all years, 237 of Golden Gate Solar’s 237 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (146, 61.6%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJapan Solar (Infini Co. Ltd)0122
SolarWorld035
JinkoSolar012
Suniva012
JA Solar06
Inverter makerEnphase0146
SolarEdge093
SMA016
APsystems (Altenergy Power System)02
Northern Electric02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 192 of 237 installs, inverters on 237. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1024187Not found in the CSLB License Master file pulled Nov 4, 2026119
930634Not found in the CSLB License Master file pulled Nov 4, 2026113

License numbers are the ones the utilities recorded on the interconnection applications (236 of 237 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Golden Gate Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192021202220232024Total
City and County of San Francisco1024187372718340

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Francisco121
San Mateo39
Contra Costa31
Alameda18
San Joaquin7
Santa Clara7
Kings6
Tulare3
Merced2
Solano2
Fresno1

Top cities

CityInstalls
San Francisco121
Daly City17
Richmond14
South San Francisco9
Oakland8
San Bruno8
Antioch6
San Pablo5
Tracy5
Hanford4
San Jose4
San Leandro4
Hayward3
Bay Point2
Gilroy2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Golden Gate Solar235
Golden gate Solar1
GOLDEN GATE SOLAR1

Common questions

Where does Golden Gate Solar install solar?

Its installs are spread across 11 counties. The most are in San Francisco County (121 installs), followed by San Mateo County (39).

How often does Golden Gate Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Golden Gate Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 237 interconnected installs with a tariff recorded (237) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.