Golden Gate Photovoltaic

How many solar installs has Golden Gate Photovoltaic done in California, and which license number is on its installs?

Golden Gate Photovoltaic has 163 residential solar installs interconnected in California, active in the records from 2017 through 2024 (May 26, 2017 to Jan 9, 2024), most of them in Alameda County (73), Contra Costa County (57) and Santa Clara County (13). The license number recorded on most of its installs, 510488, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
163
Last 24 months
0
Total capacity
1,127.3 kW DC
Median system size
6.5 kW DC
With battery storage
1.2% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 163 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Aug 14, 2023
Ownership types recorded
none recorded
First install
May 26, 2017
Latest install
Jan 9, 2024
Counties
9
Utilities
PGE 163
CSLB license
510488

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017150
2018180
2019460
2020260
2021220
2022202
2023150
202410
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 163 interconnected installs (0.6% of the 163 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 14, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.6%not counted
NEM 2.016198.8%2 (1.2%)
Net Billing Tariff10.6%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Golden Gate Photovoltaic’s installs. No residential system in the file lists a third-party owner name that matches Golden Gate Photovoltaic exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 158 of Golden Gate Photovoltaic’s 163 installs name a module maker in the “Generator Manufacturer” fields, and most of those (111, 70.3%) used modules recorded as LG.

Across all years, 163 of Golden Gate Photovoltaic’s 163 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (113, 69.3%) used inverters recorded as SolarEdge.

Across all years, 2 of Golden Gate Photovoltaic’s 163 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG0111
REC025
Panasonic08
Qcells05
Hyundai02
Inverter makerSolarEdge0113
Enphase051
ABB01
Power-One01
Battery makerEnphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 158 of 163 installs, inverters on 163. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Golden Gate Photovoltaic as developer on 2 battery storage projects and as installer on 1 (1 name it as both), 2 projects in all with 52 kWh of storage. 2 have the status Paid, with $11,217 in current incentive allocations. Applications were received from Aug 26, 2021 to Jul 30, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid252$11,217

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage129$7,8201$7,820
Small Residential Storage123$3,3971$3,397

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
510488Not found in the CSLB License Master file pulled Nov 4, 2026162

License numbers are the ones the utilities recorded on the interconnection applications (163 of 163 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Golden Gate Photovoltaic’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020Total
City and County of San Francisco510488101
unincorporated Marin County510488011

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Alameda73
Contra Costa57
Santa Clara13
San Joaquin8
San Mateo7
Solano2
Marin1
San Francisco1
Stanislaus1

Top cities

CityInstalls
San Ramon13
Fremont10
Livermore10
Hayward9
Martinez9
San Jose9
San Lorenzo9
Pleasanton8
Danville6
Oakland6
Tracy6
San Leandro5
Walnut Creek5
Piedmont4
Castro Valley3

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GOLDEN GATE PHOTOVOLTAIC96
Golden Gate Photovoltaic62
GOLDEN GATE PHOTOVOLTAIC LLC3
golden Gate Photovoltaic1
Golden Gate photovoltaic1

Common questions

Where does Golden Gate Photovoltaic install solar?

Its installs are spread across 9 counties. The most are in Alameda County (73 installs), followed by Contra Costa County (57).

How often does Golden Gate Photovoltaic install batteries with solar?

1.2% of its interconnected solar installs include battery storage across all years.

How many Golden Gate Photovoltaic installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 163 interconnected installs (0.6% of the 163 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.