Green Volt Energy

How many solar installs has Green Volt Energy done in California, and which license number is on its installs?

Green Volt Energy has 83 residential solar installs interconnected in California, active in the records from 2012 through 2019 (Jan 30, 2012 to Apr 9, 2019), most of them in Orange County (39), Los Angeles County (22) and San Diego County (9). CSLB lists license 936034 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
83
Last 24 months
0
Total capacity
580.8 kW DC
Median system size
6.2 kW DC
With battery storage
1.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 76 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
9.8 kWh (1 installs list a capacity)
First install
Jan 30, 2012
Latest install
Apr 9, 2019
Counties
7
Utilities
SCE 63, SDGE 19, PGE 1
CSLB license
936034

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201260
201310
201410
2015180
2016280
2017170
201890
201931
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 83 interconnected installs with a tariff recorded (83) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06375.9%not counted
NEM 2.02024.1%1 (9.1%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Green Volt Energy’s installs. No residential system in the file lists a third-party owner name that matches Green Volt Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 73 of Green Volt Energy’s 83 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (26, 35.6%) used modules recorded as SolarWorld.

Across all years, 82 of Green Volt Energy’s 83 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (50, 61.0%) used inverters recorded as Enphase.

Across all years, 1 of Green Volt Energy’s 83 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld026
LG012
Sunpreme09
Canadian Solar08
Solaria08
Inverter makerEnphase050
SolarEdge031
SMA01
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 73 of 83 installs, inverters on 82. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Green Volt Energy as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 10 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jun 7, 2017 to Jun 15, 2017.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled210$7,843

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage210$7,8430$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
936034Sole owner license (name not shown)CLEARC-10 Electrical ContractorJul 31, 2009Jul 31, 202767

License numbers are the ones the utilities recorded on the interconnection applications (67 of 83 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 936034. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Orange39
Los Angeles22
San Diego9
Riverside7
San Bernardino4
Kern1
Ventura1

Top cities

CityInstalls
Orange9
Laguna Hills6
Corona4
Cerritos3
Laguna Niguel3
Placentia3
Rancho Palos Verdes3
Yorba Linda3
Dana Point2
Huntington Beach2
Irvine2
La Canada2
La Canada Flintridge2
San Clemente2
San Juan Capo2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Green Volt Energy62
GREEN VOLT ENERGY20
Green Volt ENERGY1

Common questions

Where does Green Volt Energy install solar?

Its installs are spread across 7 counties. The most are in Orange County (39 installs), followed by Los Angeles County (22).

How often does Green Volt Energy install batteries with solar?

1.6% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Green Volt Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 83 interconnected installs with a tariff recorded (83) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.