Ground Up Builders
How many solar installs has Ground Up Builders done in California, and which license number is on its installs?
Ground Up Builders has 332 residential solar installs interconnected in California, active in the records from 2014 through 2024 (Sep 18, 2014 to Jan 25, 2024), most of them in Los Angeles County (122), Riverside County (45) and San Luis Obispo County (40). CSLB lists license 911849 (GROUND UP BUILDERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Nov 30, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to Ground Up Builders here carry more than one CSLB license number: 911849 on 317 (CSLB holder GROUND UP BUILDERS, Van Nuys) and 870569 on 10 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 332
- Last 24 months
- 0
- Total capacity
- 1,655.2 kW DC
- Median system size
- 4.5 kW DC
- With battery storage
- 0.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.3% of 287 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 1 installs, latest Jan 25, 2024
- Ownership types recorded
- lease 1
- Median battery size
- 9.8 kWh (1 installs list a capacity)
- First install
- Sep 18, 2014
- Latest install
- Jan 25, 2024
- Counties
- 14
- Utilities
- SCE 250, PGE 79, SDGE 3
- CSLB license
- 911849, 870569
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2014 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2014 | 22 | 0 |
| 2015 | 97 | 0 |
| 2016 | 132 | 0 |
| 2017 | 61 | 0 |
| 2018 | 15 | 1 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 1 | 0 |
| 2023 | 3 | 0 |
| 2024 | 1 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
1 of its 332 interconnected installs (0.3% of the 332 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 25, 2024.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 277 | 83.4% | not counted |
| NEM 2.0 | 54 | 16.3% | 1 (1.9%) |
| Net Billing Tariff | 1 | 0.3% | 0 (0.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 1 of Ground Up Builders’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Ground Up Builders exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Clean Power Finance | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 286 of Ground Up Builders’ 332 installs name a module maker in the “Generator Manufacturer” fields, and most of those (233, 81.5%) used modules recorded as SolarWorld.
Across all years, 332 of Ground Up Builders’ 332 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (306, 92.2%) used inverters recorded as Enphase.
Across all years, 1 of Ground Up Builders’ 332 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.
1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SolarWorld | 0 | 233 |
| Sun Edison | 0 | 41 | |
| LG | 0 | 4 | |
| SunEdison | 0 | 3 | |
| Qcells | 0 | 2 | |
| Inverter maker | Enphase | 0 | 306 |
| SolarEdge | 0 | 24 | |
| SMA | 0 | 2 | |
| SunPower | 0 | 1 | |
| Battery maker | LG | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 286 of 332 installs, inverters on 332. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 911849 | GROUND UP BUILDERS (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor | Mar 5, 2008 | Nov 30, 2028 | 317 |
| 870569 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 10 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (329 of 332 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 911849. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| Los Angeles | 122 |
| Riverside | 45 |
| San Luis Obispo | 40 |
| Orange | 30 |
| San Bernardino | 30 |
| Santa Barbara | 19 |
| Ventura | 17 |
| Kern | 12 |
| Fresno | 7 |
| Santa Clara | 4 |
| San Francisco | 3 |
| Alameda | 1 |
| San Diego | 1 |
| San Mateo | 1 |
Top cities
| City | Installs |
|---|---|
| Palmdale | 14 |
| Lancaster | 11 |
| Santa Maria | 10 |
| Bakersfield | 9 |
| Nipomo | 9 |
| Paso Robles | 8 |
| Long Beach | 7 |
| Covina | 6 |
| Huntington Beach | 6 |
| Riverside | 6 |
| San Bernardino | 6 |
| Arroyo Grande | 5 |
| Carson | 5 |
| Desert Hot Springs | 5 |
| Fresno | 5 |
Names as recorded by the utilities
The utilities recorded this installer under 12 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Ground Up Builders | 238 |
| GROUND UP BUILDERS | 58 |
| Ground up builders | 10 |
| ground up builders | 7 |
| Ground Up Builders Inc. | 5 |
| Ground up Builders | 3 |
| ground up builders inc | 3 |
| Ground Up builders | 2 |
| Ground Up BUilders | 2 |
| Ground UP Builders | 2 |
| Ground Up Builders Inc | 1 |
| Ground Up Builders Inc, | 1 |
Common questions
Where does Ground Up Builders install solar?
Its installs are spread across 14 counties. The most are in Los Angeles County (122 installs), followed by Riverside County (45).
How often does Ground Up Builders install batteries with solar?
0.3% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Ground Up Builders installs are under NEM 3.0 (the Net Billing Tariff)?
1 of its 332 interconnected installs (0.3% of the 332 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.