Ground Up Builders has 332 residential solar installs interconnected in California, active in the records from 2014 through 2024 (Sep 18, 2014 to Jan 25, 2024), most of them in Los Angeles County (122), Riverside County (45) and San Luis Obispo County (40). CSLB lists license 911849 (GROUND UP BUILDERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Nov 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Ground Up Builders here carry more than one CSLB license number: 911849 on 317 (CSLB holder GROUND UP BUILDERS, Van Nuys) and 870569 on 10 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
332
Last 24 months
0
Total capacity
1,655.2 kW DC
Median system size
4.5 kW DC
With battery storage
0.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.3% of 287 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jan 25, 2024
Ownership types recorded
lease 1
Median battery size
9.8 kWh (1 installs list a capacity)
First install
Sep 18, 2014
Latest install
Jan 25, 2024
Counties
14
Utilities
SCE 250, PGE 79, SDGE 3
CSLB license
911849, 870569

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014220
2015970
20161320
2017610
2018151
201900
202000
202100
202210
202330
202410
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 332 interconnected installs (0.3% of the 332 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 25, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.027783.4%not counted
NEM 2.05416.3%1 (1.9%)
Net Billing Tariff10.3%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Ground Up Builders’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Ground Up Builders exactly.

Third-party owner named on its installsInstalls
Clean Power Finance1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 286 of Ground Up Builders’ 332 installs name a module maker in the “Generator Manufacturer” fields, and most of those (233, 81.5%) used modules recorded as SolarWorld.

Across all years, 332 of Ground Up Builders’ 332 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (306, 92.2%) used inverters recorded as Enphase.

Across all years, 1 of Ground Up Builders’ 332 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld0233
Sun Edison041
LG04
SunEdison03
Qcells02
Inverter makerEnphase0306
SolarEdge024
SMA02
SunPower01
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 286 of 332 installs, inverters on 332. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
911849GROUND UP BUILDERS (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorMar 5, 2008Nov 30, 2028317
870569Not found in the CSLB License Master file pulled Nov 4, 202610

License numbers are the ones the utilities recorded on the interconnection applications (329 of 332 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 911849. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles122
Riverside45
San Luis Obispo40
Orange30
San Bernardino30
Santa Barbara19
Ventura17
Kern12
Fresno7
Santa Clara4
San Francisco3
Alameda1
San Diego1
San Mateo1

Top cities

CityInstalls
Palmdale14
Lancaster11
Santa Maria10
Bakersfield9
Nipomo9
Paso Robles8
Long Beach7
Covina6
Huntington Beach6
Riverside6
San Bernardino6
Arroyo Grande5
Carson5
Desert Hot Springs5
Fresno5

Names as recorded by the utilities

The utilities recorded this installer under 12 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Ground Up Builders238
GROUND UP BUILDERS58
Ground up builders10
ground up builders7
Ground Up Builders Inc.5
Ground up Builders3
ground up builders inc3
Ground Up builders2
Ground Up BUilders2
Ground UP Builders2
Ground Up Builders Inc1
Ground Up Builders Inc,1

Common questions

Where does Ground Up Builders install solar?

Its installs are spread across 14 counties. The most are in Los Angeles County (122 installs), followed by Riverside County (45).

How often does Ground Up Builders install batteries with solar?

0.3% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Ground Up Builders installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 332 interconnected installs (0.3% of the 332 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources