GSE SOLAR SYSTEMS INC
How many solar installs has GSE SOLAR SYSTEMS INC done in California, and which license number is on its installs?
GSE SOLAR SYSTEMS INC has 108 residential solar installs interconnected in California, active in the records from 2002 through 2026 (Jun 5, 2002 to Jan 23, 2026), most of them in San Bernardino County (82), Riverside County (14) and Los Angeles County (9). CSLB lists license 1024264 (GSE SOLAR SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Mar 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to GSE SOLAR SYSTEMS INC here carry more than one CSLB license number: 1024264 on 72 (CSLB holder GSE SOLAR SYSTEMS INC, Adelanto) and 624881 on 29 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 108
- Last 24 months
- 12
- Total capacity
- 985.5 kW DC
- Median system size
- 7.2 kW DC
- With battery storage
- 8.3% all time; 50.0% last 24 months
- Third-party owned
- 1.0% of 100 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 13 installs, latest Jan 23, 2026
- Ownership types recorded
- other 1
- Median battery size
- 10.1 kWh (9 installs list a capacity)
- First install
- Jun 5, 2002
- Latest install
- Jan 23, 2026
- Counties
- 5
- Utilities
- SCE 108
- CSLB license
- 1024264, 624881
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2002 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2002 | 2 | 0 |
| 2003 | 0 | 0 |
| 2004 | 0 | 0 |
| 2005 | 0 | 0 |
| 2006 | 1 | 0 |
| 2007 | 1 | 0 |
| 2008 | 3 | 0 |
| 2009 | 0 | 0 |
| 2010 | 0 | 0 |
| 2011 | 1 | 0 |
| 2012 | 3 | 0 |
| 2013 | 10 | 0 |
| 2014 | 6 | 0 |
| 2015 | 4 | 1 |
| 2016 | 3 | 0 |
| 2017 | 9 | 0 |
| 2018 | 6 | 0 |
| 2019 | 6 | 0 |
| 2020 | 5 | 1 |
| 2021 | 8 | 1 |
| 2022 | 5 | 0 |
| 2023 | 18 | 0 |
| 2024 | 8 | 2 |
| 2025 | 5 | 2 |
| 2026 (through Aug 31, 2026) | 4 | 2 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
13 of its 108 interconnected installs (12.0% of the 108 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 46.2% of those include battery storage. The latest Net Billing Tariff install was approved Jan 23, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 39 | 36.1% | not counted |
| NEM 2.0 | 56 | 51.9% | 2 (3.6%) |
| Net Billing Tariff | 13 | 12.0% | 6 (46.2%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 1 of GSE SOLAR SYSTEMS INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches GSE SOLAR SYSTEMS INC exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| GSE Solar | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 12 of GSE SOLAR SYSTEMS INC’s 12 installs name a module maker in the “Generator Manufacturer” fields, and most of those (9, 75.0%) used modules recorded as Aptos Solar.
In the last 24 months, 12 of GSE SOLAR SYSTEMS INC’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 66.7%) used inverters recorded as Enphase.
In the last 24 months, 3 of GSE SOLAR SYSTEMS INC’s 12 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as Enphase.
4 of 9 battery-paired PG&E and SCE installs (44.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Aptos Solar | 9 | 28 |
| EG4 | 3 | not in top list | |
| Astronergy (Chint) | 1 | not in top list | |
| Magnus green solar LLC | 1 | not in top list | |
| Trina Solar | 1 | not in top list | |
| Inverter maker | Enphase | 8 | 72 |
| EG4 | 2 | not in top list | |
| Delta Electronics | 1 | not in top list | |
| Sol-Ark | 1 | not in top list | |
| Battery maker | Enphase | 3 | 4 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 80 of 108 installs, inverters on 107. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1024264 | GSE SOLAR SYSTEMS INC (Corporation) | CLEAR | C-46 Solar Contractor | Mar 3, 2017 | Mar 31, 2027 | 72 |
| 624881 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 29 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (106 of 108 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1024264. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list GSE SOLAR SYSTEMS INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2023 | Total |
|---|---|---|---|
| unincorporated San Diego County | 1024264 | 1 | 1 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
| County | Installs |
|---|---|
| San Bernardino | 82 |
| Riverside | 14 |
| Los Angeles | 9 |
| Kern | 2 |
| Ventura | 1 |
Top cities
| City | Installs |
|---|---|
| Apple Valley | 13 |
| Pinon Hills | 12 |
| Hesperia | 11 |
| Yucca Valley | 11 |
| Oak Hills | 6 |
| Rancho Mirage | 6 |
| Phelan | 5 |
| Palm Desert | 4 |
| Victorville | 4 |
| Adelanto | 3 |
| Joshua Tree | 3 |
| Littlerock | 3 |
| Highland | 2 |
| Rancho Cucamonga | 2 |
| Redlands | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| GSE SOLAR SYSTEMS INC | 69 |
| GSE SOLAR SYSTEMS | 32 |
| GSE Solar Systems | 7 |
Common questions
Where does GSE SOLAR SYSTEMS INC install solar?
Its installs are spread across 5 counties. The most are in San Bernardino County (82 installs), followed by Riverside County (14).
How often does GSE SOLAR SYSTEMS INC install batteries with solar?
8.3% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (6 of 12).
How many GSE SOLAR SYSTEMS INC installs are under NEM 3.0 (the Net Billing Tariff)?
13 of its 108 interconnected installs (12.0% of the 108 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 46.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.