Heritage Solar

How many solar installs has Heritage Solar done in California, and which license number is on its installs?

Heritage Solar has 336 residential solar installs interconnected in California, active in the records from 2006 through 2015 (Oct 20, 2006 to Dec 10, 2015), most of them in San Diego County (128), Orange County (122) and Riverside County (49). The license number recorded on most of its installs, 871563, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
336
Last 24 months
0
Total capacity
2,596.3 kW DC
Median system size
7 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
67.3% of 162 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 2, lease 104, other 3
First install
Oct 20, 2006
Latest install
Dec 10, 2015
Counties
5
Utilities
SCE 196, SDGE 140
CSLB license
871563

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200610
200770
2008130
2009220
2010230
2011190
2012240
2013870
2014660
2015740
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 336 interconnected installs with a tariff recorded (336) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0336100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 109 of Heritage Solar’s installs the utility recorded a third-party ownership type: PPA 2, lease 104, prepaid lease 0, other 3. Across all installers, 12 residential systems list a third-party owner name that matches Heritage Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunpower Capital, LLC.61
SUNPOWER17
Sunpower Solar Program 1, LLC15
Heritage Solar Inc.11
SunPower Solar Program I, LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 127 of Heritage Solar’s 336 installs name a module maker in the “Generator Manufacturer” fields, and most of those (111, 87.4%) used modules recorded as SunPower.

Across all years, 299 of Heritage Solar’s 336 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (92, 30.8%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0111
LG09
AU Optronics02
Kyocera01
Sanyo01
Inverter makerSunPower092
SMA069
Power-One036
Xantrex Technology Inc.033
Fronius029

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 127 of 336 installs, inverters on 299. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Heritage Solar as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 10 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Aug 12, 2023 to Aug 12, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled110$1,303

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage110$1,3030$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
871563Not found in the CSLB License Master file pulled Nov 4, 2026169

License numbers are the ones the utilities recorded on the interconnection applications (169 of 336 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Diego128
Orange122
Riverside49
Los Angeles22
San Bernardino15

Top cities

CityInstalls
San Diego32
Corona13
Poway13
Santa Ana12
Orange10
El Cajon9
Huntington Beach9
Irvine8
Lakeside8
Alpine7
Cypress7
Escondido7
Mission Viejo7
Oceanside7
Fallbrook6

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HERITAGE SOLAR INC155
Heritage Solar146
Heritage Solar, Inc.34
HERITAGE SOLAR, INC1

Common questions

Where does Heritage Solar install solar?

Its installs are spread across 5 counties. The most are in San Diego County (128 installs), followed by Orange County (122).

How often does Heritage Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Heritage Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 336 interconnected installs with a tariff recorded (336) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.