How many solar installs has IMPERIAL ELECTRIC done in California, and which license number is on its installs?

IMPERIAL ELECTRIC has 81 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Jun 7, 2010 to Jul 23, 2026), most of them in Los Angeles County (53), Ventura County (24) and Orange County (1). CSLB lists license 1019219 (IMPERIAL ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
81
Last 24 months
4
Total capacity
820.7 kW DC
Median system size
10 kW DC
With battery storage
17.3% all time; 75.0% last 24 months
Third-party owned
0.0% of 81 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
8 installs, latest Jul 23, 2026
Ownership types recorded
none recorded
Median battery size
10.1 kWh (14 installs list a capacity)
First install
Jun 7, 2010
Latest install
Jul 23, 2026
Counties
6
Utilities
SCE 81
CSLB license
1019219

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201100
201200
201300
201400
201500
201600
201700
201800
201900
202000
2021294
2022296
2023171
202410
202532
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

8 of its 81 interconnected installs (9.9% of the 81 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 37.5% of those include battery storage. The latest Net Billing Tariff install was approved Jul 23, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.2%not counted
NEM 2.07288.9%11 (15.3%)
Net Billing Tariff89.9%3 (37.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on IMPERIAL ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches IMPERIAL ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of IMPERIAL ELECTRIC’s 4 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 50.0%) used modules recorded as REC.

In the last 24 months, 4 of IMPERIAL ELECTRIC’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 3 of IMPERIAL ELECTRIC’s 4 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as Enphase.

11 of 14 battery-paired PG&E and SCE installs (78.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC212
Hyundai11
Qcells157
Inverter makerEnphase427
Battery makerEnphase38

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 75 of 81 installs, inverters on 81. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1019219IMPERIAL ELECTRIC (Corporation)CLEARC-10 Electrical ContractorOct 10, 2016Oct 31, 202880

License numbers are the ones the utilities recorded on the interconnection applications (81 of 81 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1019219. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles53
Ventura24
Orange1
Riverside1
San Bernardino1
Santa Barbara1

Top cities

CityInstalls
Simi Valley7
Calabasas6
Thousand Oaks6
Newbury Park5
Valencia5
Agoura Hills4
La Canada4
Camarillo3
Canyon Country3
Santa Monica3
Torrance3
Beverly Hills2
Manhattan Beach2
Saugus2
South Pasadena2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
IMPERIAL ELECTRIC80
Imperial Electric Co1

Common questions

Where does IMPERIAL ELECTRIC install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (53 installs), followed by Ventura County (24).

How often does IMPERIAL ELECTRIC install batteries with solar?

17.3% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (3 of 4).

How many IMPERIAL ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

8 of its 81 interconnected installs (9.9% of the 81 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 37.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.