Independent Energy Solutions

How many solar installs has Independent Energy Solutions done in California, and which license number is on its installs?

Independent Energy Solutions has 135 residential solar installs interconnected in California, active in the records from 2003 through 2016 (Sep 29, 2003 to Dec 14, 2016), most of them in San Diego County (132), Monterey County (2) and Orange County (1). The license number recorded on most of its installs, 805159, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
135
Last 24 months
0
Total capacity
824.9 kW DC
Median system size
5.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 73 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Sep 29, 2003
Latest install
Dec 14, 2016
Counties
3
Utilities
SDGE 133, PGE 2
CSLB license
805159

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200320
200440
200530
200620
200730
200830
200900
201010
201100
201210
201380
2014270
2015550
2016260
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 135 interconnected installs with a tariff recorded (135) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012693.3%not counted
NEM 2.096.7%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Independent Energy Solutions’s installs. No residential system in the file lists a third-party owner name that matches Independent Energy Solutions exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 114 of Independent Energy Solutions’ 135 installs name a module maker in the “Generator Manufacturer” fields, and most of those (67, 58.8%) used modules recorded as LG.

Across all years, 122 of Independent Energy Solutions’ 135 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (106, 86.9%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG067
SolarWorld027
Kyocera07
SunPower05
Hyundai03
Inverter makerEnphase0106
SMA09
SolarEdge04
SunPower03
OutBack Power01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 114 of 135 installs, inverters on 122. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Independent Energy Solutions as developer on 0 battery storage projects and as installer on 4 (0 name it as both), 4 projects in all with 123 kWh of storage. 4 have the status Paid, with $129,600 in current incentive allocations. Applications were received from Nov 16, 2011 to Feb 25, 2013.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid4123$129,600

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated4123$129,6004$129,600

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
805159Not found in the CSLB License Master file pulled Nov 4, 202611

License numbers are the ones the utilities recorded on the interconnection applications (12 of 135 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Diego132
Monterey2
Orange1

Top cities

CityInstalls
Vista21
San Diego19
Carlsbad16
Escondido11
Oceanside10
San Marcos8
Bonita5
Fallbrook4
Poway4
La Jolla3
La Mesa3
Lakeside3
Valley Center3
Alpine2
Chula Vista2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Independent Energy Solutions133
Independent Energy Solutions Inc1
Independent Energy Solutions, Inc. DBA R1

Common questions

Where does Independent Energy Solutions install solar?

Its installs are spread across 3 counties. The most are in San Diego County (132 installs), followed by Monterey County (2).

How often does Independent Energy Solutions install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Independent Energy Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 135 interconnected installs with a tariff recorded (135) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.