JARCO ROOFING SOLAR CONSTRUCTION

How many solar installs has JARCO ROOFING SOLAR CONSTRUCTION done in California, and which license number is on its installs?

JARCO ROOFING SOLAR CONSTRUCTION has 96 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Dec 28, 2015 to May 26, 2026), most of them in Riverside County (92) and San Bernardino County (4). CSLB lists license 800984 (JARCO ROOFING SOLAR CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
96
Last 24 months
21
Total capacity
683.6 kW DC
Median system size
7.2 kW DC
With battery storage
6.3% all time; 28.6% last 24 months
Third-party owned
0.0% of 96 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
22 installs, latest May 26, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (6 installs list a capacity)
First install
Dec 28, 2015
Latest install
May 26, 2026
Counties
2
Utilities
SCE 96
CSLB license
800984

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201510
201610
201700
201800
201900
202000
202140
2022200
2023320
2024190
2025103
2026 (through Aug 31, 2026)93

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

22 of its 96 interconnected installs (22.9% of the 96 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 27.3% of those include battery storage. The latest Net Billing Tariff install was approved May 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.022.1%not counted
NEM 2.07275.0%0 (0.0%)
Net Billing Tariff2222.9%6 (27.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on JARCO ROOFING SOLAR CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches JARCO ROOFING SOLAR CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 21 of JARCO ROOFING SOLAR CONSTRUCTION’s 21 installs name a module maker in the “Generator Manufacturer” fields, and most of those (16, 76.2%) used modules recorded as Qcells.

In the last 24 months, 21 of JARCO ROOFING SOLAR CONSTRUCTION’s 21 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 95.2%) used inverters recorded as Enphase.

In the last 24 months, 6 of JARCO ROOFING SOLAR CONSTRUCTION’s 21 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 100.0%) used batteries recorded as Enphase.

6 of 6 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1678
JinkoSolar55
Inverter makerEnphase2060
SolarEdge123
Battery makerEnphase66

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 94 of 96 installs, inverters on 96. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
800984JARCO ROOFING SOLAR CONSTRUCTION (Corporation)CLEARB General Building Contractor; C-39 Roofing ContractorNov 8, 2001Nov 30, 202796

License numbers are the ones the utilities recorded on the interconnection applications (96 of 96 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 800984. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list JARCO ROOFING SOLAR CONSTRUCTION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920212022202320242026Total
unincorporated San Diego County800984233583125

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside92
San Bernardino4

Top cities

CityInstalls
Canyon Lake38
Temecula22
Murrieta14
Menifee4
Corona3
Rancho Cucamonga3
Sun City3
Wildomar3
Lake Elsinore2
Winchester2
Hemet1
Joshua Tree1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
JARCO ROOFING SOLAR CONSTRUCTION94
Jarco Roofing Solar Construction2

Common questions

Where does JARCO ROOFING SOLAR CONSTRUCTION install solar?

Its installs are spread across 2 counties. The most are in Riverside County (92 installs), followed by San Bernardino County (4).

How often does JARCO ROOFING SOLAR CONSTRUCTION install batteries with solar?

6.3% of its interconnected solar installs include battery storage across all years, and 28.6% in the last 24 months (6 of 21).

How many JARCO ROOFING SOLAR CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

22 of its 96 interconnected installs (22.9% of the 96 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 27.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.