Energy Outlet

How many solar installs has Energy Outlet done in California, and which license number is on its installs?

Energy Outlet has 107 residential solar installs interconnected in California, active in the records from 2014 through 2025 (Jul 1, 2014 to Oct 30, 2025), most of them in San Diego County (88), Orange County (18) and San Bernardino County (1). CSLB lists license 1092568 (TENCO SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Energy Outlet here carry more than one CSLB license number: 1092568 on 58 (CSLB holder TENCO SOLAR INC, Anaheim) and 800984 on 25 (CSLB holder JARCO ROOFING SOLAR CONSTRUCTION, Perris), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
107
Last 24 months
7
Total capacity
665.5 kW DC
Median system size
5.3 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 98 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest May 19, 2025
Ownership types recorded
none recorded
First install
Jul 1, 2014
Latest install
Oct 30, 2025
Counties
3
Utilities
SDGE 106, SCE 1
CSLB license
1092568, 800984

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201460
201540
201610
201700
201840
201920
202060
202150
2022130
2023480
2024130
202550
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 107 interconnected installs (6.5% of the 107 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved May 19, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0109.3%not counted
NEM 2.09084.1%not recorded
Net Billing Tariff76.5%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Energy Outlet’s installs. No residential system in the file lists a third-party owner name that matches Energy Outlet exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Energy Outlet’s 7 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 83.3%) used modules recorded as Qcells.

In the last 24 months, 7 of Energy Outlet’s 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells569
Canadian Solar112
Inverter makerEnphase7103

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 98 of 107 installs, inverters on 107. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1092568TENCO SOLAR INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJun 9, 2022Jun 30, 202858
800984JARCO ROOFING SOLAR CONSTRUCTION (Corporation)CLEARB General Building Contractor; C-39 Roofing ContractorNov 8, 2001Nov 30, 202725

License numbers are the ones the utilities recorded on the interconnection applications (96 of 107 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1092568, 800984. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Energy Outlet’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222024Total
unincorporated San Diego County1092568112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego88
Orange18
San Bernardino1

Top cities

CityInstalls
San Diego29
Fallbrook16
Carlsbad11
Chula Vista6
Escondido5
San Clemente5
Laguna Niguel4
Ramona4
La Mesa3
Vista3
Las Flores2
Oceanside2
Poway2
Rancho Santa Fe2
San Juan Capo2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Energy Outlet106
ENERGY OUTLET1

Common questions

Where does Energy Outlet install solar?

Its installs are spread across 3 counties. The most are in San Diego County (88 installs), followed by Orange County (18).

How often does Energy Outlet install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Energy Outlet installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 107 interconnected installs (6.5% of the 107 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.