Tenco Solar Inc

How many solar installs has Tenco Solar Inc done in California, and which license number is on its installs?

Tenco Solar Inc has 271 residential solar installs interconnected in California, active in the records from 2008 through 2026 (Dec 26, 2008 to Aug 19, 2026), most of them in Orange County (90), Los Angeles County (70) and Riverside County (45). CSLB lists license 1092568 (TENCO SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Tenco Solar Inc here carry more than one CSLB license number: 1092568 on 129 (CSLB holder TENCO SOLAR INC, Anaheim) and 820684 on 119 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
271
Last 24 months
17
Total capacity
2,183.1 kW DC
Median system size
7.3 kW DC
With battery storage
13.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 23.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 248 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
26 installs, latest Aug 19, 2026
Ownership types recorded
none recorded
Median battery size
10.1 kWh (30 installs list a capacity)
First install
Dec 26, 2008
Latest install
Aug 19, 2026
Counties
8
Utilities
SCE 222, SDGE 46, PGE 3
CSLB license
1092568, 820684

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200810
200900
201090
201130
201260
2013100
201420
2015150
2016180
201790
2018120
2019131
202090
2021120
20226410
2023569
2024187
2025112
2026 (through Aug 31, 2026)31

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

26 of its 271 interconnected installs (9.6% of the 271 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 38.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06524.0%not counted
NEM 2.018066.4%20 (12.6%)
Net Billing Tariff269.6%10 (38.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Tenco Solar Inc’s installs. No residential system in the file lists a third-party owner name that matches Tenco Solar Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 17 of Tenco Solar Inc’s 17 installs name a module maker in the “Generator Manufacturer” fields, and most of those (14, 82.4%) used modules recorded as Canadian Solar.

In the last 24 months, 17 of Tenco Solar Inc’s 17 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (16, 94.1%) used inverters recorded as Enphase.

In the last 24 months, 4 of Tenco Solar Inc’s 17 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used batteries recorded as Enphase.

27 of 30 battery-paired PG&E and SCE installs (90.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar1481
Qcells270
United Renewable Energy1not in top list
Inverter makerEnphase16139
Generac1not in top list
Battery makerEnphase325
Generac11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 238 of 271 installs, inverters on 268. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Tenco Solar Inc as developer on 7 battery storage projects and as installer on 7 (7 name it as both), 7 projects in all with 165 kWh of storage. 2 have the status Paid, with $7,973 in current incentive allocations. Applications were received from Sep 16, 2022 to Nov 13, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid239$7,973
Pending Reservation129$3,910
Cancelled497$18,248

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage478$10,5801$1,456
Large-Scale Storage387$19,5511$6,517

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1092568TENCO SOLAR INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJun 9, 2022Jun 30, 2028129
820684Not found in the CSLB License Master file pulled Nov 4, 2026119

License numbers are the ones the utilities recorded on the interconnection applications (249 of 271 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1092568. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Tenco Solar Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222024Total
unincorporated San Diego County1092568112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange90
Los Angeles70
Riverside45
San Diego33
San Bernardino26
Ventura4
Tuolumne2
Fresno1

Top cities

CityInstalls
Yorba Linda15
Long Beach11
Orange11
Huntington Beach9
Mission Viejo8
Rancho Palos Verdes8
Carlsbad7
Riverside6
Santa Ana6
Corona5
Fontana5
Irvine5
San Diego5
San Juan Capo5
Canyon Country4

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TENCO SOLAR INC108
Tenco Solar Inc64
TENCO SOLAR59
Tenco Solar14
Tenco Solar Inc.14
TENCO SOLAR, INC7
Tenco Solar, Inc4
TENCO SOLAR, INC.1

Common questions

Where does Tenco Solar Inc install solar?

Its installs are spread across 8 counties. The most are in Orange County (90 installs), followed by Los Angeles County (70).

How often does Tenco Solar Inc install batteries with solar?

13.3% of its interconnected solar installs include battery storage across all years, and 23.5% in the last 24 months (4 of 17). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Tenco Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

26 of its 271 interconnected installs (9.6% of the 271 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 38.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.