How many solar installs has LANDMARK REMODELING COMPANY done in California, and which license number is on its installs?

LANDMARK REMODELING COMPANY has 44 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Oct 10, 2024 to Aug 12, 2026), most of them in Los Angeles County (34), Orange County (3) and Riverside County (2). CSLB lists license 1053170 (LANDMARK REMODELING COMPANY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
44
Last 24 months
44
Total capacity
240.7 kW DC
Median system size
4.4 kW DC
With battery storage
36.4% all time; 36.4% last 24 months
Third-party owned
0.0% of 44 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
44 installs, latest Aug 12, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (14 installs list a capacity)
First install
Oct 10, 2024
Latest install
Aug 12, 2026
Counties
7
Utilities
SCE 42, PGE 2
CSLB license
1053170

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202430
2025197
2026 (through Aug 31, 2026)229

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

44 of its 44 interconnected installs (100.0% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 36.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff44100.0%16 (36.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on LANDMARK REMODELING COMPANY’s installs. No residential system in the file lists a third-party owner name that matches LANDMARK REMODELING COMPANY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 44 of LANDMARK REMODELING COMPANY’s 44 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (12, 27.3%) used modules recorded as Phono Solar.

In the last 24 months, 44 of LANDMARK REMODELING COMPANY’s 44 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 59.1%) used inverters recorded as Enphase.

In the last 24 months, 15 of LANDMARK REMODELING COMPANY’s 44 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 60.0%) used batteries recorded as Enphase.

15 of 16 battery-paired PG&E and SCE installs (93.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPhono Solar1212
Gstar1111
JA Solar66
Solaria55
Phono Solar Technology22
Inverter makerEnphase2626
Apsystem66
Tesla66
APsystems (Altenergy Power System)44
AP System11
Battery makerEnphase99
Tesla66

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 44 of 44 installs, inverters on 44. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1053170LANDMARK REMODELING COMPANY (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorMay 6, 2019May 31, 202744

License numbers are the ones the utilities recorded on the interconnection applications (44 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1053170. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles34
Orange3
Riverside2
Ventura2
San Bernardino1
Santa Barbara1
Santa Clara1

Top cities

CityInstalls
Hidden Hills5
Los Angeles5
Long Beach4
Altadena3
Beverly Hills3
Lancaster2
Azusa1
Calabasas1
Cerritos1
Corona1
Hermosa Beach1
Huntington Beach1
La Crescenta1
La Mirada1
Lakewood1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LANDMARK REMODELING COMPANY43
LANDMARK-REMODELING-COMPANY1

Common questions

Where does LANDMARK REMODELING COMPANY install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (34 installs), followed by Orange County (3).

How often does LANDMARK REMODELING COMPANY install batteries with solar?

36.4% of its interconnected solar installs include battery storage across all years, and 36.4% in the last 24 months (16 of 44).

How many LANDMARK REMODELING COMPANY installs are under NEM 3.0 (the Net Billing Tariff)?

44 of its 44 interconnected installs (100.0% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 36.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.