Minich & Sons Construction

How many solar installs has Minich & Sons Construction done in California, and which license number is on its installs?

Minich & Sons Construction has 143 residential solar installs interconnected in California, active in the records from 2012 through 2025 (Jan 23, 2012 to Dec 22, 2025), most of them in San Diego County (138) and Orange County (5). CSLB lists license 958182 (MINICH & SON'S CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
143
Last 24 months
10
Total capacity
919.7 kW DC
Median system size
6.3 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 120 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Oct 20, 2025
Ownership types recorded
none recorded
First install
Jan 23, 2012
Latest install
Dec 22, 2025
Counties
2
Utilities
SDGE 143
CSLB license
958182

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201250
201370
2014110
2015120
2016110
201790
2018110
201990
202090
202180
202260
2023260
2024110
202580
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 143 interconnected installs (1.4% of the 143 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Oct 20, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04128.7%not counted
NEM 2.010069.9%not recorded
Net Billing Tariff21.4%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Minich & Sons Construction’s installs. No residential system in the file lists a third-party owner name that matches Minich & Sons Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of Minich & Sons Construction’s 10 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 70.0%) used modules recorded as Qcells.

In the last 24 months, 10 of Minich & Sons Construction’s 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (9, 90.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells732
LG159
LONGi1not in top list
UnitedRenewableEnergyCo.,Ltd.1not in top list
Inverter makerEnphase9129
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 142 of 143 installs, inverters on 137. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
958182MINICH & SON'S CONSTRUCTION INC (Corporation)CLEARB General Building ContractorMar 1, 2011Mar 31, 2027102

License numbers are the ones the utilities recorded on the interconnection applications (102 of 143 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 958182. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Minich & Sons Construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242026Total
unincorporated San Diego County9581826954273238

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego138
Orange5

Top cities

CityInstalls
San Diego43
Jamul27
El Cajon26
La Mesa8
Spring Valley6
Alpine5
Lakeside5
Ramona5
San Marcos4
Santee4
La Jolla3
Bonita1
Chula Vista1
Del Mar1
Dulzura1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Minich & Sons Construction143

Common questions

Where does Minich & Sons Construction install solar?

Its installs are spread across 2 counties. The most are in San Diego County (138 installs), followed by Orange County (5).

How often does Minich & Sons Construction install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many Minich & Sons Construction installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 143 interconnected installs (1.4% of the 143 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.