Mission Solar Electric

How many solar installs has Mission Solar Electric done in California, and which license number is on its installs?

Mission Solar Electric has 238 residential solar installs interconnected in California, active in the records from 2013 through 2025 (Apr 4, 2013 to Dec 8, 2025), most of them in San Diego County (227) and Orange County (11). CSLB lists license 905059 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
238
Last 24 months
5
Total capacity
1,652.2 kW DC
Median system size
6.4 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 181 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jun 20, 2025
Ownership types recorded
none recorded
First install
Apr 4, 2013
Latest install
Dec 8, 2025
Counties
2
Utilities
SDGE 238
CSLB license
905059

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
2013260
2014240
2015330
2016310
2017190
2018160
2019250
202090
2021130
2022190
2023110
202490
202530
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 238 interconnected installs (0.4% of the 238 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jun 20, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010443.7%not counted
NEM 2.013355.9%not recorded
Net Billing Tariff10.4%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Mission Solar Electric’s installs. No residential system in the file lists a third-party owner name that matches Mission Solar Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of Mission Solar Electric’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used modules recorded as Trina Solar.

In the last 24 months, 5 of Mission Solar Electric’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 80.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar3not in top list
LONGi1not in top list
Inverter makerEnphase4178
SolarEdge132

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 217 of 238 installs, inverters on 238. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
905059Sole owner license (name not shown)CLEARC-10 Electrical ContractorOct 17, 2007Oct 31, 2027145

License numbers are the ones the utilities recorded on the interconnection applications (145 of 238 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 905059. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Mission Solar Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
unincorporated San Diego County9050597422232123

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego227
Orange11

Top cities

CityInstalls
San Diego94
El Cajon21
Coronado17
Jamul17
La Mesa12
Chula Vista10
Alpine9
Del Mar7
Lakeside7
Poway7
Ramona7
Borrego Springs4
Escondido4
Spring Valley4
Carlsbad3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Mission Solar Electric238

Common questions

Where does Mission Solar Electric install solar?

Its installs are spread across 2 counties. The most are in San Diego County (227 installs), followed by Orange County (11).

How often does Mission Solar Electric install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many Mission Solar Electric installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 238 interconnected installs (0.4% of the 238 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.