Modern Solar Electric & Contracting Inc. has 74 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Jul 24, 2015 to Apr 16, 2026), most of them in San Bernardino County (61), Riverside County (7) and Orange County (3). CSLB lists license 829108 (MODERN SOLAR ELECTRIC & CONTRACTING INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
74
Last 24 months
11
Total capacity
562.5 kW DC
Median system size
5.9 kW DC
With battery storage
5.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 18.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
2.7% of 74 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
9 installs, latest Apr 16, 2026
Ownership types recorded
PPA 1, lease 1
Median battery size
21.5 kWh (4 installs list a capacity)
First install
Jul 24, 2015
Latest install
Apr 16, 2026
Counties
5
Utilities
SCE 71, SDGE 2, PGE 1
CSLB license
829108

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201550
2016120
2017130
201810
201940
202061
202140
202240
202380
202481
202581
2026 (through Aug 31, 2026)11

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

9 of its 74 interconnected installs (12.2% of the 74 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The latest Net Billing Tariff install was approved Apr 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02736.5%not counted
NEM 2.03851.4%1 (2.7%)
Net Billing Tariff912.2%3 (33.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2 of Modern Solar Electric & Contracting Inc.’s installs the utility recorded a third-party ownership type: PPA 1, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Modern Solar Electric & Contracting Inc. exactly.

Third-party owner named on its installsInstalls
Sunnova Energy Corp1
Vivint Solar Developer, LLC.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 11 of Modern Solar Electric & Contracting Inc.’s 11 installs name a module maker in the “Generator Manufacturer” fields, and most of those (8, 72.7%) used modules recorded as Aptos Solar.

In the last 24 months, 11 of Modern Solar Electric & Contracting Inc.’s 11 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 54.5%) used inverters recorded as Aptos Solar.

In the last 24 months, none of Modern Solar Electric & Contracting Inc.’s 11 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 4 battery-paired PG&E and SCE installs (25.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar89
Bluesun Solar313
EG42not in top list
Inverter makerAptos Solar67
EG422
Enphase112
SolarEdge148
SunPower13
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 74 of 74 installs, inverters on 74. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
829108MODERN SOLAR ELECTRIC & CONTRACTING INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorDec 18, 2003Feb 28, 202773

License numbers are the ones the utilities recorded on the interconnection applications (73 of 74 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 829108. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Bernardino61
Riverside7
Orange3
San Diego2
Monterey1

Top cities

CityInstalls
Yucca Valley28
Joshua Tree16
Twentynine Palms7
Chino Hills3
Morongo Valley3
Palm Springs3
Pioneertown2
Aliso Viejo1
Campo1
Desert Hot Springs1
Garden Grove1
Landers1
Menifee1
Orange1
Palm Desert1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MODERN SOLAR ELECTRIC & CONTRACTING INC42
Modern Solar Electric & Contracting Inc.23
Modern Solar Electric & Contracting Inc5
Modern Solar Electric & Contracting1
MODERN SOLAR ELECTRIC & CONTRACTING INC.1
Modern Solar Electric & Contracting, Inc.1
Modern Solar Electric and Contracting Inc1

Common questions

Where does Modern Solar Electric & Contracting Inc. install solar?

Its installs are spread across 5 counties. The most are in San Bernardino County (61 installs), followed by Riverside County (7).

How often does Modern Solar Electric & Contracting Inc. install batteries with solar?

5.6% of its interconnected solar installs include battery storage across all years, and 18.2% in the last 24 months (2 of 11). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Modern Solar Electric & Contracting Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

9 of its 74 interconnected installs (12.2% of the 74 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.