Mother Nature Construction

How many solar installs has Mother Nature Construction done in California, and which license number is on its installs?

Mother Nature Construction has 257 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Mar 6, 2012 to Jul 28, 2026), most of them in Alameda County (71), Santa Clara County (71) and Contra Costa County (59). CSLB lists license 548164 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
257
Last 24 months
34
Total capacity
1,719.6 kW DC
Median system size
6.4 kW DC
With battery storage
10.1% all time; 52.9% last 24 months
Third-party owned
0.0% of 257 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
27 installs, latest May 20, 2026
Ownership types recorded
none recorded
Median battery size
13 kWh (15 installs list a capacity)
First install
Mar 6, 2012
Latest install
Jul 28, 2026
Counties
15
Utilities
PGE 252, SCE 5
CSLB license
548164

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201250
201390
2014260
2015180
201620
201740
201800
201940
2020140
2021160
2022455
2023653
2024211
2025126
2026 (through Aug 31, 2026)1611

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

27 of its 257 interconnected installs (10.5% of the 257 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 51.9% of those include battery storage. The latest Net Billing Tariff install was approved May 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06324.5%not counted
NEM 2.016765.0%11 (6.6%)
Net Billing Tariff2710.5%14 (51.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Mother Nature Construction’s installs. No residential system in the file lists a third-party owner name that matches Mother Nature Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 33 of Mother Nature Construction’s 34 installs name a module maker in the “Generator Manufacturer” fields, and most of those (24, 72.7%) used modules recorded as REC.

In the last 24 months, 34 of Mother Nature Construction’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (24, 70.6%) used inverters recorded as Enphase.

In the last 24 months, 12 of Mother Nature Construction’s 34 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (10, 83.3%) used batteries recorded as Tesla.

20 of 26 battery-paired PG&E and SCE installs (76.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC2427
Qcells11123
Canadian Solar179
LG111
Silfab1not in top list
Inverter makerEnphase24245
Tesla1620
SolarEdge24
SunPower14
Battery makerTesla1014
Enphase26

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 251 of 257 installs, inverters on 257. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
548164Sole owner license (name not shown)CLEARB General Building ContractorNov 16, 1988Jan 31, 2028241

License numbers are the ones the utilities recorded on the interconnection applications (241 of 257 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 548164. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Mother Nature Construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182020Total
unincorporated Marin County548164213

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda71
Santa Clara71
Contra Costa59
San Mateo16
Sonoma12
Solano8
Marin7
San Bernardino3
San Joaquin3
San Benito2
Fresno1
Los Angeles1
Monterey1
Orange1
Placer1

Top cities

CityInstalls
San Jose40
Pleasanton16
Fremont15
Danville12
Oakland12
San Ramon11
Dublin9
Santa Rosa9
Saratoga7
Livermore5
Mountain View5
Redwood City5
San Carlos5
Sunnyvale5
Brentwood4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MOTHER NATURE CONSTRUCTION201
Mother Nature Construction56

Common questions

Where does Mother Nature Construction install solar?

Its installs are spread across 15 counties. The most are in Alameda County (71 installs), followed by Santa Clara County (71).

How often does Mother Nature Construction install batteries with solar?

10.1% of its interconnected solar installs include battery storage across all years, and 52.9% in the last 24 months (18 of 34).

How many Mother Nature Construction installs are under NEM 3.0 (the Net Billing Tariff)?

27 of its 257 interconnected installs (10.5% of the 257 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 51.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.