Nippon Energy INC

How many solar installs has Nippon Energy INC done in California, and which license number is on its installs?

Nippon Energy INC has 186 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Dec 20, 2014 to May 1, 2026), most of them in San Bernardino County (107), Los Angeles County (31) and Orange County (23). CSLB lists license 975779 (NIPPON ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
186
Last 24 months
15
Total capacity
1,768 kW DC
Median system size
7.8 kW DC
With battery storage
8.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 61.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 185 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
20 installs, latest May 1, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (15 installs list a capacity)
First install
Dec 20, 2014
Latest install
May 1, 2026
Counties
8
Utilities
SCE 169, SDGE 14, PGE 3
CSLB license
975779

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
201530
2016160
2017190
2018240
2019190
2020140
2021190
2022201
2023291
2024107
2025104
2026 (through Aug 31, 2026)22

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

20 of its 186 interconnected installs (10.8% of the 186 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 55.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved May 1, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02714.5%not counted
NEM 2.013974.7%5 (3.9%)
Net Billing Tariff2010.8%10 (55.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Nippon Energy INC’s installs. No residential system in the file lists a third-party owner name that matches Nippon Energy INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 15 of Nippon Energy INC’s 15 installs name a module maker in the “Generator Manufacturer” fields, and most of those (10, 66.7%) used modules recorded as Hyundai.

In the last 24 months, 15 of Nippon Energy INC’s 15 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (10, 66.7%) used inverters recorded as Enphase.

In the last 24 months, 8 of Nippon Energy INC’s 15 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (4, 50.0%) used batteries recorded as Enphase.

15 of 15 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai1010
LONGi2not in top list
Canadian Solar146
Silfab1not in top list
Sunspark Technology1not in top list
Inverter makerEnphase10136
Tesla58
Battery makerEnphase411
Tesla44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 179 of 186 installs, inverters on 186. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
975779NIPPON ENERGY INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorAug 14, 2012Aug 31, 2028184

License numbers are the ones the utilities recorded on the interconnection applications (184 of 186 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 975779. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Nippon Energy INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated San Diego County97577911

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Bernardino107
Los Angeles31
Orange23
San Diego7
Ventura7
Riverside6
Kern4
Contra Costa1

Top cities

CityInstalls
Victorville26
Apple Valley23
Barstow15
Hesperia15
Lancaster7
Phelan7
Irvine5
Cypress4
Mission Viejo4
Oceanside4
Palmdale4
Bell Canyon3
Fontana3
Newberry Springs3
Pinon Hills3

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NIPPON ENERGY INC147
Nippon Energy INC22
Nippon Energy14
NIPPON ENERGY2
NIPPON ENERGY INC.1

Common questions

Where does Nippon Energy INC install solar?

Its installs are spread across 8 counties. The most are in San Bernardino County (107 installs), followed by Los Angeles County (31).

How often does Nippon Energy INC install batteries with solar?

8.7% of its interconnected solar installs include battery storage across all years, and 61.5% in the last 24 months (8 of 13). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Nippon Energy INC installs are under NEM 3.0 (the Net Billing Tariff)?

20 of its 186 interconnected installs (10.8% of the 186 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 55.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.