OFFGrid Systems Inc.

How many solar installs has OFFGrid Systems Inc. done in California, and which license number is on its installs?

OFFGrid Systems Inc. has 87 residential solar installs interconnected in California, active in the records from 2013 through 2020 (Nov 21, 2013 to Apr 11, 2020), most of them in San Diego County (81) and Orange County (6). The license number recorded on most of its installs, 984905, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
87
Last 24 months
0
Total capacity
646.7 kW DC
Median system size
6.1 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 64 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Nov 21, 2013
Latest install
Apr 11, 2020
Counties
2
Utilities
SDGE 86, SCE 1
CSLB license
984905

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201330
2014160
2015180
2016290
201730
201820
2019130
202030
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 87 interconnected installs with a tariff recorded (87) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06271.3%not counted
NEM 2.02528.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on OFFGrid Systems Inc.’s installs. No residential system in the file lists a third-party owner name that matches OFFGrid Systems Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 86 of OFFGrid Systems Inc.’s 87 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (39, 45.3%) used modules recorded as LG.

Across all years, 87 of OFFGrid Systems Inc.’s 87 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (56, 64.4%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG039
Phono Solar Technology021
SolarWorld011
Qcells06
Canadian Solar04
Inverter makerEnphase056
SMA015
SolarEdge09
Fronius04
OutBack Power01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 86 of 87 installs, inverters on 87. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names OFFGrid Systems Inc. as developer on 0 battery storage projects and as installer on 3 (0 name it as both), 3 projects in all with 42 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Feb 23, 2016 to Feb 23, 2016.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled342$40,788

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated342$40,7880$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
984905Not found in the CSLB License Master file pulled Nov 4, 202632

License numbers are the ones the utilities recorded on the interconnection applications (33 of 87 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list OFFGrid Systems Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020Total
unincorporated San Diego County98490567114

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego81
Orange6

Top cities

CityInstalls
El Cajon24
La Mesa15
San Diego8
Santee6
Spring Valley6
Lakeside5
Alpine4
Ramona4
Lemon Grove3
Chula Vista2
Bonita1
Borrego Springs1
Campo1
Carlsbad1
Descanso1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
OFFGrid Systems Inc.86
OFFGRID SYSTEMS INC1

Common questions

Where does OFFGrid Systems Inc. install solar?

Its installs are spread across 2 counties. The most are in San Diego County (81 installs), followed by Orange County (6).

How often does OFFGrid Systems Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many OFFGrid Systems Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 87 interconnected installs with a tariff recorded (87) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.