How many solar installs has Palmetto Solar done in California, and which license number is on its installs?

Palmetto Solar has 35 residential solar installs interconnected in California, active in the records from 2021 through 2025 (Dec 14, 2021 to Apr 14, 2025), most of them in San Diego County (26), Los Angeles County (3) and Orange County (3). CSLB lists license 1048921 (LIGHTREACH) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
35
Last 24 months
1
Total capacity
229.2 kW DC
Median system size
6.3 kW DC
With battery storage
16.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
8.6% of 35 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 3
First install
Dec 14, 2021
Latest install
Apr 14, 2025
Counties
6
Utilities
SDGE 29, SCE 5, PGE 1
CSLB license
1048921

Is Palmetto Solar still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (0 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202110
2022190
2023130
202410
202511
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 35 interconnected installs with a tariff recorded (35) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.035100.0%1 (16.7%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of Palmetto Solar’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 0. Across all installers, 384 residential systems list a third-party owner name that matches Palmetto Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
PALMETTO SOLAR LLC2
Sunnova1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Palmetto Solar’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Qcells.

In the last 24 months, 1 of Palmetto Solar’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as SolarEdge.

In the last 24 months, 1 of Palmetto Solar’s 1 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as SolarEdge.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells125
Inverter makerSolarEdge131
Battery makerSolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 34 of 35 installs, inverters on 35. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Palmetto Solar as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 10 kWh of storage. 1 have the status Paid, with $1,170 in current incentive allocations. Applications were received from Oct 8, 2025 to Oct 8, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid110$1,170

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage110$1,1701$1,170

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1048921LIGHTREACH (Limited Liability)CLEAR, Pending Case/CITB General Building Contractor; C-10 Electrical ContractorJan 14, 2019Jan 31, 202734

License numbers are the ones the utilities recorded on the interconnection applications (35 of 35 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1048921. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Palmetto Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021202220232024Total
City and County of San Francisco1048921006410
unincorporated San Diego County104892114005

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego26
Los Angeles3
Orange3
Kings1
San Bernardino1
Sonoma1

Top cities

CityInstalls
San Diego11
San Marcos4
Oceanside2
Valley Center2
Baldwin Park1
Campo1
Capistrano Bch1
Carlsbad1
Chula Vista1
Downey1
Encinitas1
Fallbrook1
Hanford1
Hesperia1
La Puente1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Palmetto Solar29
PALMETTO SOLAR LLC5
PALMETTO SOLAR1

Common questions

Where does Palmetto Solar install solar?

Its installs are spread across 6 counties. The most are in San Diego County (26 installs), followed by Los Angeles County (3).

How often does Palmetto Solar install batteries with solar?

16.7% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Palmetto Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 35 interconnected installs with a tariff recorded (35) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.