POWER SOLAR STRUCTURES CONSTRUCTION

How many solar installs has POWER SOLAR STRUCTURES CONSTRUCTION done in California, and which license number is on its installs?

POWER SOLAR STRUCTURES CONSTRUCTION has 227 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Mar 25, 2019 to Aug 13, 2026), most of them in San Joaquin County (88), Alameda County (55) and Contra Costa County (29). CSLB lists license 1051351 (POWER SOLAR STRUCTURES CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
227
Last 24 months
42
Total capacity
1,717.1 kW DC
Median system size
6.9 kW DC
With battery storage
18.5% all time; 73.8% last 24 months
Third-party owned
0.0% of 227 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
38 installs, latest Aug 13, 2026
Ownership types recorded
none recorded
Median battery size
17 kWh (8 installs list a capacity)
First install
Mar 25, 2019
Latest install
Aug 13, 2026
Counties
13
Utilities
PGE 227
CSLB license
1051351

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019200
2020190
2021160
2022514
2023693
20242616
20251311
2026 (through Aug 31, 2026)138

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

38 of its 227 interconnected installs (16.7% of the 227 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 13, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.018983.3%10 (5.3%)
Net Billing Tariff3816.7%32 (84.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on POWER SOLAR STRUCTURES CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches POWER SOLAR STRUCTURES CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 37 of POWER SOLAR STRUCTURES CONSTRUCTION’s 42 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 40.5%) used modules recorded as SunPower.

In the last 24 months, 42 of POWER SOLAR STRUCTURES CONSTRUCTION’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (34, 81.0%) used inverters recorded as Enphase.

In the last 24 months, 24 of POWER SOLAR STRUCTURES CONSTRUCTION’s 42 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (20, 83.3%) used batteries recorded as Enphase.

32 of 42 battery-paired PG&E and SCE installs (76.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower1516
CertainTeed1290
Panasonic4not in top list
EG43not in top list
Solaria257
Inverter makerEnphase34208
EG444
Tesla46
SunPower36
FranklinWH1not in top list
Battery makerEnphase2026
Tesla33
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 215 of 227 installs, inverters on 227. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names POWER SOLAR STRUCTURES CONSTRUCTION as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 19 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Nov 16, 2021 to Nov 16, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled119$2,912

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage119$2,9120$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1051351POWER SOLAR STRUCTURES CONSTRUCTION (Corporation)CLEARB General Building ContractorMar 15, 2019Mar 31, 2027227

License numbers are the ones the utilities recorded on the interconnection applications (227 of 227 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1051351. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Joaquin88
Alameda55
Contra Costa29
Santa Clara25
Calaveras11
San Mateo7
Tuolumne5
Lake2
Monterey1
Placer1
Santa Cruz1
Stanislaus1
Yolo1

Top cities

CityInstalls
Stockton73
San Jose16
Dublin13
Fremont11
Oakland8
San Ramon7
Concord6
Manteca6
Pleasanton6
Valley Springs6
Livermore5
Union City5
Byron4
Danville3
Morgan Hill3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
POWER SOLAR STRUCTURES CONSTRUCTION227

Common questions

Where does POWER SOLAR STRUCTURES CONSTRUCTION install solar?

Its installs are spread across 13 counties. The most are in San Joaquin County (88 installs), followed by Alameda County (55).

How often does POWER SOLAR STRUCTURES CONSTRUCTION install batteries with solar?

18.5% of its interconnected solar installs include battery storage across all years, and 73.8% in the last 24 months (31 of 42).

How many POWER SOLAR STRUCTURES CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

38 of its 227 interconnected installs (16.7% of the 227 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.