How many solar installs has R E Pierro Construction done in California, and which license number is on its installs?

R E Pierro Construction has 120 residential solar installs interconnected in California, active in the records from 2009 through 2016 (Nov 10, 2009 to Sep 15, 2016), most of them in San Bernardino County (52), Riverside County (38) and Los Angeles County (20). The license number recorded on most of its installs, 733173, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
120
Last 24 months
0
Total capacity
565 kW DC
Median system size
4.5 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 115 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Nov 10, 2009
Latest install
Sep 15, 2016
Counties
6
Utilities
SCE 115, SDGE 5
CSLB license
733173

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201000
201100
201200
201350
201450
2015620
2016470
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 120 interconnected installs with a tariff recorded (120) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0120100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on R E Pierro Construction’s installs. No residential system in the file lists a third-party owner name that matches R E Pierro Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 112 of R E Pierro Construction’s 120 installs name a module maker in the “Generator Manufacturer” fields, and most of those (106, 94.6%) used modules recorded as Stion.

Across all years, 120 of R E Pierro Construction’s 120 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (109, 90.8%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerStion0106
SolarWorld04
REC02
Inverter makerSolarEdge0109
SMA06
Enphase04
Advanced Energy, Inc.01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 112 of 120 installs, inverters on 120. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
733173Not found in the CSLB License Master file pulled Nov 4, 2026114

License numbers are the ones the utilities recorded on the interconnection applications (115 of 120 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino52
Riverside38
Los Angeles20
San Diego5
Orange4
Kern1

Top cities

CityInstalls
Victorville12
Perris8
La Puente6
Hesperia5
Rialto5
Adelanto4
Beaumont4
Redlands4
Chino3
Corona3
Highland3
Lake Elsinore3
Menifee3
Rancho Cucamonga3
Riverside3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
R E Pierro Construction110
R.E. Pierro Construction10

Common questions

Where does R E Pierro Construction install solar?

Its installs are spread across 6 counties. The most are in San Bernardino County (52 installs), followed by Riverside County (38).

How often does R E Pierro Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many R E Pierro Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 120 interconnected installs with a tariff recorded (120) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.