READY HOME ENERGY INC

How many solar installs has READY HOME ENERGY INC done in California, and which license number is on its installs?

READY HOME ENERGY INC has 417 residential solar installs interconnected in California, active in the records from 2020 through 2023 (Jun 17, 2020 to Nov 28, 2023), most of them in Placer County (149), San Joaquin County (148) and Solano County (83). The license number recorded on most of its installs, 1056045, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
417
Last 24 months
0
Total capacity
1,459.5 kW DC
Median system size
3.3 kW DC
With battery storage
1.4% all time; no installs in the last 24 months last 24 months
Third-party owned
0.2% of 417 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
28 installs, latest Sep 8, 2023
Ownership types recorded
lease 1
First install
Jun 17, 2020
Latest install
Nov 28, 2023
Counties
6
Utilities
PGE 417
CSLB license
1056045

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020230
2021650
20222271
20231025
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

28 of its 417 interconnected installs (6.7% of the 417 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 3.6% of those include battery storage. The latest Net Billing Tariff install was approved Sep 8, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.038993.3%5 (1.3%)
Net Billing Tariff286.7%1 (3.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of READY HOME ENERGY INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches READY HOME ENERGY INC exactly.

Third-party owner named on its installsInstalls
TIM LEWIS COMMUNITIES1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 416 of READY HOME ENERGY INC’s 417 installs name a module maker in the “Generator Manufacturer” fields, and most of those (220, 52.9%) used modules recorded as Canadian Solar.

Across all years, 417 of READY HOME ENERGY INC’s 417 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (416, 99.8%) used inverters recorded as Enphase.

Across all years, 5 of READY HOME ENERGY INC’s 417 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 80.0%) used batteries recorded as Enphase.

5 of 6 battery-paired PG&E and SCE installs (83.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar0220
Solaria0151
Silfab034
LONGi011
Inverter makerEnphase0416
Solaria01
Tesla01
Battery makerEnphase04
Tesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 416 of 417 installs, inverters on 417. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1056045Not found in the CSLB License Master file pulled Nov 4, 2026415

License numbers are the ones the utilities recorded on the interconnection applications (416 of 417 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Placer149
San Joaquin148
Solano83
Amador19
Yolo17
Stanislaus1

Top cities

CityInstalls
Manteca148
Rocklin124
Vacaville44
Fairfield39
Granite Bay24
Plymouth19
Woodland17
Loomis1
Newman1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
READY HOME ENERGY INC408
Ready Home Energy9

Common questions

Where does READY HOME ENERGY INC install solar?

Its installs are spread across 6 counties. The most are in Placer County (149 installs), followed by San Joaquin County (148).

How often does READY HOME ENERGY INC install batteries with solar?

1.4% of its interconnected solar installs include battery storage across all years.

How many READY HOME ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

28 of its 417 interconnected installs (6.7% of the 417 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 3.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.