RIGHT WAY SOLAR ELECTRIC INC

How many solar installs has RIGHT WAY SOLAR ELECTRIC INC done in California, and which license number is on its installs?

RIGHT WAY SOLAR ELECTRIC INC has 115 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Sep 8, 2017 to Jun 15, 2026), most of them in Los Angeles County (89), Kern County (9) and Santa Barbara County (6). CSLB lists license 995398 (RIGHT WAY SOLAR ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
115
Last 24 months
20
Total capacity
701.1 kW DC
Median system size
5 kW DC
With battery storage
5.2% all time; 25.0% last 24 months
Third-party owned
0.0% of 115 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
20 installs, latest Jun 15, 2026
Ownership types recorded
none recorded
Median battery size
9.7 kWh (6 installs list a capacity)
First install
Sep 8, 2017
Latest install
Jun 15, 2026
Counties
9
Utilities
SCE 104, PGE 11
CSLB license
995398

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201730
2018280
2019140
2020120
2021130
2022120
202390
2024124
202551
2026 (through Aug 31, 2026)71

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

20 of its 115 interconnected installs (17.4% of the 115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 30.0% of those include battery storage. The latest Net Billing Tariff install was approved Jun 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.09582.6%0 (0.0%)
Net Billing Tariff2017.4%6 (30.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on RIGHT WAY SOLAR ELECTRIC INC’s installs. No residential system in the file lists a third-party owner name that matches RIGHT WAY SOLAR ELECTRIC INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 20 of RIGHT WAY SOLAR ELECTRIC INC’s 20 installs name a module maker in the “Generator Manufacturer” fields, and most of those (12, 60.0%) used modules recorded as Mission Solar.

In the last 24 months, 20 of RIGHT WAY SOLAR ELECTRIC INC’s 20 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (17, 85.0%) used inverters recorded as SolarEdge.

In the last 24 months, 5 of RIGHT WAY SOLAR ELECTRIC INC’s 20 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 80.0%) used batteries recorded as SolarEdge.

6 of 6 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar1244
Solar4America Technology Inc.33
SolarEver Technologia33
Canadian Solar25
Inverter makerSolarEdge1796
Enphase213
Tesla12
Battery makerSolarEdge45
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 114 of 115 installs, inverters on 115. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
995398RIGHT WAY SOLAR ELECTRIC INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorAug 5, 2014Aug 31, 2028115

License numbers are the ones the utilities recorded on the interconnection applications (115 of 115 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 995398. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles89
Kern9
Santa Barbara6
Riverside3
San Joaquin3
Ventura2
San Bernardino1
San Luis Obispo1
Sonoma1

Top cities

CityInstalls
Lancaster67
California City9
Guadalupe5
Palmdale5
Santa Clarita4
Leona Valley2
Manteca2
Quartz Hill2
Acton1
Chino Hills1
Hawthorne1
La Mirada1
Lakewood1
Littlerock1
Monrovia1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RIGHT WAY SOLAR ELECTRIC INC115

Common questions

Where does RIGHT WAY SOLAR ELECTRIC INC install solar?

Its installs are spread across 9 counties. The most are in Los Angeles County (89 installs), followed by Kern County (9).

How often does RIGHT WAY SOLAR ELECTRIC INC install batteries with solar?

5.2% of its interconnected solar installs include battery storage across all years, and 25.0% in the last 24 months (5 of 20).

How many RIGHT WAY SOLAR ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

20 of its 115 interconnected installs (17.4% of the 115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 30.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.