RPS SOLAR

How many solar installs has RPS SOLAR done in California, and which license number is on its installs?

RPS SOLAR has 66 residential solar installs interconnected in California, active in the records from 2017 through 2023 (Jun 9, 2017 to Sep 21, 2023), most of them in San Diego County (61) and Orange County (5). The license number recorded on most of its installs, 1022433, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
66
Last 24 months
0
Total capacity
438 kW DC
Median system size
5.3 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 66 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jun 9, 2017
Latest install
Sep 21, 2023
Counties
2
Utilities
SDGE 66
CSLB license
1022433

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201720
201880
2019140
2020100
2021150
202290
202380
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 66 interconnected installs with a tariff recorded (66) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.066100.0%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on RPS SOLAR’s installs. No residential system in the file lists a third-party owner name that matches RPS SOLAR exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 59 of RPS SOLAR’s 66 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (21, 35.6%) used modules recorded as Qcells.

Across all years, 66 of RPS SOLAR’s 66 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (49, 74.2%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells021
Axitec07
PEIMAR07
REC07
Canadian Solar06
Inverter makerSolarEdge049
ChiliconPower,LLC011
Enphase03
APsystems (Altenergy Power System)01
Northern Electric01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 59 of 66 installs, inverters on 66. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1022433Not found in the CSLB License Master file pulled Nov 4, 202659

License numbers are the ones the utilities recorded on the interconnection applications (66 of 66 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list RPS SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020202120222023Total
unincorporated San Diego County10224331333111

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego61
Orange5

Top cities

CityInstalls
San Diego39
Chula Vista9
Borrego Springs4
Escondido2
La Mesa2
Spring Valley2
Alpine1
Bonita1
Campo1
El Cajon1
Encinitas1
Poway1
Ramona1
San Marcos1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RPS SOLAR66

Common questions

Where does RPS SOLAR install solar?

Its installs are spread across 2 counties. The most are in San Diego County (61 installs), followed by Orange County (5).

How often does RPS SOLAR install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many RPS SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 66 interconnected installs with a tariff recorded (66) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.