SANTA CRUZ RENEWABLES

How many solar installs has SANTA CRUZ RENEWABLES done in California, and which license number is on its installs?

SANTA CRUZ RENEWABLES has 118 residential solar installs interconnected in California, active in the records from 2019 through 2026 (May 3, 2019 to Aug 27, 2026), most of them in Santa Clara County (38), Santa Cruz County (29) and Alameda County (14). CSLB lists license 1046417 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Nov 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
118
Last 24 months
26
Total capacity
886.5 kW DC
Median system size
6.8 kW DC
With battery storage
25.4% all time; 88.5% last 24 months
Third-party owned
0.0% of 118 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
27 installs, latest Aug 27, 2026
Ownership types recorded
none recorded
Median battery size
9.8 kWh (1 installs list a capacity)
First install
May 3, 2019
Latest install
Aug 27, 2026
Counties
14
Utilities
PGE 118
CSLB license
1046417

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019130
2020230
2021191
2022171
2023151
202497
20251615
2026 (through Aug 31, 2026)65

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

27 of its 118 interconnected installs (22.9% of the 118 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.09177.1%4 (4.4%)
Net Billing Tariff2722.9%26 (96.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SANTA CRUZ RENEWABLES’s installs. No residential system in the file lists a third-party owner name that matches SANTA CRUZ RENEWABLES exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 26 of SANTA CRUZ RENEWABLES’ 26 installs name a module maker in the “Generator Manufacturer” fields, and most of those (25, 96.2%) used modules recorded as REC.

In the last 24 months, 26 of SANTA CRUZ RENEWABLES’ 26 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 23 of SANTA CRUZ RENEWABLES’ 26 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (23, 100.0%) used batteries recorded as Enphase.

30 of 30 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC2534
Qcells218
Inverter makerEnphase2680
SolarEdge19
Battery makerEnphase2329

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 117 of 118 installs, inverters on 118. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SANTA CRUZ RENEWABLES as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 36 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Nov 1, 2020 to Dec 24, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled119$18,786
RRF Rejected117$3,362

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency119$18,7860$0
Not stated117$3,3620$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1046417Sole owner license (name not shown)CLEARB General Building Contractor; C-46 Solar ContractorNov 2, 2018Nov 30, 2028118

License numbers are the ones the utilities recorded on the interconnection applications (118 of 118 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1046417. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SANTA CRUZ RENEWABLES’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019Total
unincorporated Marin County104641711

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Santa Clara38
Santa Cruz29
Alameda14
Contra Costa14
Yolo5
San Joaquin4
Solano3
Tehama3
Marin2
San Mateo2
Lake1
Merced1
Monterey1
San Benito1

Top cities

CityInstalls
San Jose14
Santa Cruz10
Aptos7
Morgan Hill7
Los Gatos6
Castro Valley5
Soquel5
Gilroy4
Milpitas4
Pleasanton4
Fairfield3
Red Bluff3
San Ramon3
Stockton3
Woodland3

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SANTA CRUZ RENEWABLES107
Santa Cruz Renewables8
santa cruz renewables3

Common questions

Where does SANTA CRUZ RENEWABLES install solar?

Its installs are spread across 14 counties. The most are in Santa Clara County (38 installs), followed by Santa Cruz County (29).

How often does SANTA CRUZ RENEWABLES install batteries with solar?

25.4% of its interconnected solar installs include battery storage across all years, and 88.5% in the last 24 months (23 of 26).

How many SANTA CRUZ RENEWABLES installs are under NEM 3.0 (the Net Billing Tariff)?

27 of its 118 interconnected installs (22.9% of the 118 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.