Skelly Electric Inc has 80 residential solar installs interconnected in California, active in the records from 2003 through 2026 (Oct 10, 2003 to Apr 9, 2026), most of them in San Diego County (75), Orange County (2) and Riverside County (2). CSLB lists license 328332 (SKELLY ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
80
Last 24 months
1
Total capacity
858.9 kW DC
Median system size
6.7 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 47 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Apr 9, 2026
Ownership types recorded
none recorded
First install
Oct 10, 2003
Latest install
Apr 9, 2026
Counties
4
Utilities
SDGE 77, SCE 2, PGE 1
CSLB license
328332

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200310
200400
200500
200600
200720
200800
200910
201050
201190
201240
201350
201440
201580
2016160
201710
201870
201940
202030
202130
202220
202340
202400
202500
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 80 interconnected installs (1.3% of the 80 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Apr 9, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05265.0%not counted
NEM 2.02733.8%0 (0.0%)
Net Billing Tariff11.3%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Skelly Electric Inc’s installs. No residential system in the file lists a third-party owner name that matches Skelly Electric Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Skelly Electric Inc’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as LONGi.

In the last 24 months, 1 of Skelly Electric Inc’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi1not in top list
Inverter makerEnphase153

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 69 of 80 installs, inverters on 62. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Skelly Electric Inc as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 39 kWh of storage. 1 have the status Paid, with $14,070 in current incentive allocations. Applications were received from May 1, 2017 to May 1, 2017.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid139$14,070

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage139$14,0701$14,070

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
328332SKELLY ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorNov 22, 1976Nov 30, 202829

License numbers are the ones the utilities recorded on the interconnection applications (29 of 80 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 328332. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Skelly Electric Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202320242026Total
unincorporated San Diego County328332131218

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego75
Orange2
Riverside2
Sonoma1

Top cities

CityInstalls
Escondido31
San Marcos15
San Diego7
Valley Center7
Encinitas6
Rancho Santa Fe4
Dana Point2
Blythe1
Coronado1
Fallbrook1
Imperial Beach1
Lakeside1
Murrieta1
Poway1
Windsor1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Skelly Electric Inc77
SKELLY ELECTRIC1
SKELLY ELECTRIC INC1
Skelly Electric,1

Common questions

Where does Skelly Electric Inc install solar?

Its installs are spread across 4 counties. The most are in San Diego County (75 installs), followed by Orange County (2).

How often does Skelly Electric Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Skelly Electric Inc installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 80 interconnected installs (1.3% of the 80 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.