Smart Solar Power

How many solar installs has Smart Solar Power done in California, and which license number is on its installs?

Smart Solar Power has 209 residential solar installs interconnected in California, active in the records from 2010 through 2019 (Apr 19, 2010 to Jan 16, 2019), most of them in San Bernardino County (165), Riverside County (30) and Orange County (12). The license number recorded on most of its installs, 934322, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
209
Last 24 months
0
Total capacity
1,556.2 kW DC
Median system size
6.3 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
14.1% of 156 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 21, lease 1
First install
Apr 19, 2010
Latest install
Jan 16, 2019
Counties
5
Utilities
SCE 208, SDGE 1
CSLB license
934322

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201080
2011140
2012220
2013200
2014470
2015530
2016260
2017120
201860
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 209 interconnected installs with a tariff recorded (209) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.019995.2%not counted
NEM 2.0104.8%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 22 of Smart Solar Power’s installs the utility recorded a third-party ownership type: PPA 21, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Smart Solar Power exactly.

Third-party owner named on its installsInstalls
PV Home PPA 1, LLC7
PV Home 1, LLC3
MySolar 1 LLC2
NRG Sun Cap LLC2
NRG Suncap LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 69 of Smart Solar Power’s 209 installs name a module maker in the “Generator Manufacturer” fields, and most of those (64, 92.8%) used modules recorded as SolarWorld.

Across all years, 209 of Smart Solar Power’s 209 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (195, 93.3%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld064
Qcells05
Inverter makerEnphase0195
Fronius06
SMA06
OutBack Power01
SolarEdge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 69 of 209 installs, inverters on 209. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
934322Not found in the CSLB License Master file pulled Nov 4, 2026206

License numbers are the ones the utilities recorded on the interconnection applications (208 of 209 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Bernardino165
Riverside30
Orange12
Los Angeles1
San Diego1

Top cities

CityInstalls
Yucaipa104
Redlands21
San Bernardino11
Yorba Linda11
Beaumont8
Highland8
Calimesa6
Cherry Valley6
Fontana3
Corona2
Hesperia2
Mentone2
Mira Loma2
Oak Hills2
Rancho Cucamonga2

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SMART SOLAR POWER155
Smart Solar Power50
smart solar power3
Smart solar power1

Common questions

Where does Smart Solar Power install solar?

Its installs are spread across 5 counties. The most are in San Bernardino County (165 installs), followed by Riverside County (30).

How often does Smart Solar Power install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Smart Solar Power installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 209 interconnected installs with a tariff recorded (209) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.