SolarGoingUP

How many solar installs has SolarGoingUP done in California, and which license number is on its installs?

SolarGoingUP has 71 residential solar installs interconnected in California, active in the records from 2021 through 2024 (Nov 18, 2021 to Jun 10, 2024), most of them in San Diego County (66) and Orange County (5). The license number recorded on most of its installs, 1068901, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
71
Last 24 months
0
Total capacity
435.2 kW DC
Median system size
5.2 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 71 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Feb 28, 2024
Ownership types recorded
none recorded
First install
Nov 18, 2021
Latest install
Jun 10, 2024
Counties
2
Utilities
SDGE 71
CSLB license
1068901

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202110
2022250
2023390
202460
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 71 interconnected installs (7.0% of the 71 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Feb 28, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06693.0%not recorded
Net Billing Tariff57.0%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SolarGoingUP’s installs. No residential system in the file lists a third-party owner name that matches SolarGoingUP exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 68 of SolarGoingUP’s 71 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (29, 42.6%) used modules recorded as Canadian Solar.

Across all years, 71 of SolarGoingUP’s 71 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (60, 84.5%) used inverters recorded as SMAAmerica.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar029
Silfab024
Qcells010
Aptos Solar01
CertainTeed01
Inverter makerSMAAmerica060
Enphase09
SolarEdge04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 68 of 71 installs, inverters on 71. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SolarGoingUP as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 13 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Feb 12, 2026 to Feb 12, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Waitlist113$9,450

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU113$9,4500$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1068901Not found in the CSLB License Master file pulled Nov 4, 202671

License numbers are the ones the utilities recorded on the interconnection applications (71 of 71 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SolarGoingUP’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021202220232026Total
unincorporated San Diego County1068901249217

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego66
Orange5

Top cities

CityInstalls
El Cajon13
San Diego13
Escondido7
Lemon Grove7
Fallbrook5
Carlsbad3
Santee3
Chula Vista2
La Jolla2
Lakeside2
Mission Viejo2
Oceanside2
Vista2
Borrego Springs1
Cardiff1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SolarGoingUP71

Common questions

Where does SolarGoingUP install solar?

Its installs are spread across 2 counties. The most are in San Diego County (66 installs), followed by Orange County (5).

How often does SolarGoingUP install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many SolarGoingUP installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 71 interconnected installs (7.0% of the 71 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.