Soleeva

How many solar installs has Soleeva done in California, and which license number is on its installs?

Soleeva has 90 residential solar installs interconnected in California, active in the records from 2016 through 2022 (Dec 28, 2016 to Mar 6, 2022), most of them in Santa Clara County (30), Alameda County (27) and San Joaquin County (13). CSLB lists license 997345 (SOLEEVA ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
90
Last 24 months
0
Total capacity
453.5 kW DC
Median system size
4.6 kW DC
With battery storage
1.1% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 90 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Dec 28, 2016
Latest install
Mar 6, 2022
Counties
11
Utilities
PGE 90
CSLB license
997345

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
2017280
2018371
2019230
202000
202100
202210
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 90 interconnected installs with a tariff recorded (90) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.022.2%not counted
NEM 2.08897.8%1 (1.1%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Soleeva’s installs. No residential system in the file lists a third-party owner name that matches Soleeva exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 89 of Soleeva’s 90 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (32, 36.0%) used modules recorded as Qcells.

Across all years, 90 of Soleeva’s 90 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (68, 75.6%) used inverters recorded as SolarEdge.

Across all years, 1 of Soleeva’s 90 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells032
Mission Solar021
JinkoSolar017
Canadian Solar012
LG03
Inverter makerSolarEdge068
APsystems (Altenergy Power System)014
Enphase08
Tesla01
Xantrex Technology Inc.01
Battery makerTesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 89 of 90 installs, inverters on 90. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
997345SOLEEVA ENERGY INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorOct 3, 2014Nov 30, 202790

License numbers are the ones the utilities recorded on the interconnection applications (90 of 90 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 997345. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Soleeva’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20242025Total
City and County of San Francisco997345224

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Santa Clara30
Alameda27
San Joaquin13
Contra Costa7
San Mateo5
Fresno2
San Francisco2
Calaveras1
Monterey1
San Luis Obispo1
Solano1

Top cities

CityInstalls
San Jose15
Stockton10
Hayward8
Oakland5
Sunnyvale4
Union City4
Livermore3
Morgan Hill3
Pittsburg3
Antioch2
East Palo Alto2
Fremont2
Los Altos2
Newark2
San Francisco2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Soleeva90

Common questions

Where does Soleeva install solar?

Its installs are spread across 11 counties. The most are in Santa Clara County (30 installs), followed by Alameda County (27).

How often does Soleeva install batteries with solar?

1.1% of its interconnected solar installs include battery storage across all years.

How many Soleeva installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 90 interconnected installs with a tariff recorded (90) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.