SPRECK SOLAR ELECTRIC DESIGN

How many solar installs has SPRECK SOLAR ELECTRIC DESIGN done in California, and which license number is on its installs?

SPRECK SOLAR ELECTRIC DESIGN has 84 residential solar installs interconnected in California, active in the records from 2019 through 2025 (Nov 14, 2019 to Dec 26, 2025), most of them in Contra Costa County (53), Santa Cruz County (9) and Alameda County (7). The license number recorded on most of its installs, 1053105, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
84
Last 24 months
11
Total capacity
835.2 kW DC
Median system size
7.1 kW DC
With battery storage
26.2% all time; 54.5% last 24 months
Third-party owned
0.0% of 84 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Dec 26, 2025
Ownership types recorded
none recorded
Median battery size
18 kWh (4 installs list a capacity)
First install
Nov 14, 2019
Latest install
Dec 26, 2025
Counties
11
Utilities
PGE 83, SCE 1
CSLB license
1053105

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201930
2020104
2021193
2022194
2023172
202495
202574
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 84 interconnected installs (8.3% of the 84 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 26, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.07791.7%15 (19.5%)
Net Billing Tariff78.3%7 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SPRECK SOLAR ELECTRIC DESIGN’s installs. No residential system in the file lists a third-party owner name that matches SPRECK SOLAR ELECTRIC DESIGN exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of SPRECK SOLAR ELECTRIC DESIGN’s 11 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 40.0%) used modules recorded as Qcells.

In the last 24 months, 11 of SPRECK SOLAR ELECTRIC DESIGN’s 11 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (9, 81.8%) used inverters recorded as Enphase.

In the last 24 months, 6 of SPRECK SOLAR ELECTRIC DESIGN’s 11 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (3, 50.0%) used batteries recorded as Enphase.

19 of 22 battery-paired PG&E and SCE installs (86.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells414
Solaria330
REC1not in top list
SunPower1not in top list
Znshine1not in top list
Inverter makerEnphase950
FranklinWH34
Astronergy (Chint)1not in top list
Generac110
SunPower12
Battery makerEnphase34
FranklinWH34

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 78 of 84 installs, inverters on 84. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1053105Not found in the CSLB License Master file pulled Nov 4, 202684

License numbers are the ones the utilities recorded on the interconnection applications (84 of 84 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SPRECK SOLAR ELECTRIC DESIGN’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020Total
unincorporated San Diego County105310511

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Contra Costa53
Santa Cruz9
Alameda7
Santa Clara7
San Mateo2
Calaveras1
Colusa1
Napa1
Riverside1
San Francisco1
San Joaquin1

Top cities

CityInstalls
Alamo20
Danville13
Santa Cruz8
Walnut Creek6
Lafayette4
Oakland4
Concord3
San Jose3
Cupertino2
Hercules2
Martinez2
Pittsburg2
Pleasanton2
Aptos1
Arnold1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SPRECK SOLAR ELECTRIC DESIGN84

Common questions

Where does SPRECK SOLAR ELECTRIC DESIGN install solar?

Its installs are spread across 11 counties. The most are in Contra Costa County (53 installs), followed by Santa Cruz County (9).

How often does SPRECK SOLAR ELECTRIC DESIGN install batteries with solar?

26.2% of its interconnected solar installs include battery storage across all years, and 54.5% in the last 24 months (6 of 11).

How many SPRECK SOLAR ELECTRIC DESIGN installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 84 interconnected installs (8.3% of the 84 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.