How many solar installs has STADA ENERGY done in California, and which license number is on its installs?

STADA ENERGY has 76 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Feb 8, 2017 to Aug 5, 2026), most of them in Riverside County (62), San Bernardino County (13) and Orange County (1). CSLB lists license 1021026 (STADA ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, D-63, expires Nov 30, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
76
Last 24 months
13
Total capacity
815.2 kW DC
Median system size
8.7 kW DC
With battery storage
17.1% all time; 76.9% last 24 months
Third-party owned
0.0% of 76 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
14 installs, latest Aug 5, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (13 installs list a capacity)
First install
Feb 8, 2017
Latest install
Aug 5, 2026
Counties
3
Utilities
SCE 76
CSLB license
1021026

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201720
201820
2019131
202091
2021101
2022120
2023130
202452
202577
2026 (through Aug 31, 2026)31

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

14 of its 76 interconnected installs (18.4% of the 76 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 5, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.022.6%not counted
NEM 2.06078.9%3 (5.0%)
Net Billing Tariff1418.4%10 (71.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on STADA ENERGY’s installs. No residential system in the file lists a third-party owner name that matches STADA ENERGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of STADA ENERGY’s 13 installs name a module maker in the “Generator Manufacturer” fields, and most of those (11, 84.6%) used modules recorded as REC.

In the last 24 months, 13 of STADA ENERGY’s 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 61.5%) used inverters recorded as SolarEdge.

In the last 24 months, 10 of STADA ENERGY’s 13 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 80.0%) used batteries recorded as Tesla.

13 of 13 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC1127
JinkoSolar11
Panasonic14
Inverter makerSolarEdge835
Tesla55
Battery makerTesla88
FranklinWH22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 73 of 76 installs, inverters on 76. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names STADA ENERGY as developer on 6 battery storage projects and as installer on 6 (6 name it as both), 6 projects in all with 90 kWh of storage. 3 have the status Paid, with $11,894 in current incentive allocations. Applications were received from May 24, 2019 to Dec 3, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid350$11,894
Reserved340$8,976

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage465$14,9941$6,018
Small Residential Storage225$5,8762$5,876

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1021026STADA ENERGY (Corporation)CLEARC-10 Electrical Contractor; D-63Nov 21, 2016Nov 30, 202676

License numbers are the ones the utilities recorded on the interconnection applications (76 of 76 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1021026. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Riverside62
San Bernardino13
Orange1

Top cities

CityInstalls
Palm Desert24
Indian Wells13
Rancho Mirage11
Joshua Tree7
Palm Springs6
Cathedral City4
Yucca Valley4
Calimesa1
Cherry Valley1
Corona del Mar1
Desert Hot Springs1
Murrieta1
Twentynine Palms1
Yucaipa1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
STADA ENERGY75
Stada Energy1

Common questions

Where does STADA ENERGY install solar?

Its installs are spread across 3 counties. The most are in Riverside County (62 installs), followed by San Bernardino County (13).

How often does STADA ENERGY install batteries with solar?

17.1% of its interconnected solar installs include battery storage across all years, and 76.9% in the last 24 months (10 of 13).

How many STADA ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

14 of its 76 interconnected installs (18.4% of the 76 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.