Steve Griffin Construction
How many solar installs has Steve Griffin Construction done in California, and which license number is on its installs?
Steve Griffin Construction has 54 residential solar installs interconnected in California, active in the records from 2017 through 2021 (Sep 27, 2017 to Aug 24, 2021), most of them in Riverside County (21), Orange County (17) and San Bernardino County (9). CSLB lists license 885981 (GRIFFIN STEPHEN CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires May 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 54
- Last 24 months
- 0
- Total capacity
- 353.3 kW DC
- Median system size
- 6.1 kW DC
- With battery storage
- 3.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 54 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- Median battery size
- 1.2 kWh (1 installs list a capacity)
- First install
- Sep 27, 2017
- Latest install
- Aug 24, 2021
- Counties
- 5
- Utilities
- SCE 32, SDGE 22
- CSLB license
- 885981
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2017 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2017 | 7 | 0 |
| 2018 | 30 | 1 |
| 2019 | 6 | 0 |
| 2020 | 6 | 0 |
| 2021 | 5 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 54 | 100.0% | 1 (3.1%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Steve Griffin Construction’s installs. No residential system in the file lists a third-party owner name that matches Steve Griffin Construction exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 53 of Steve Griffin Construction’s 54 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (19, 35.8%) used modules recorded as Canadian Solar.
Across all years, 54 of Steve Griffin Construction’s 54 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (42, 77.8%) used inverters recorded as SolarEdge.
0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Canadian Solar | 0 | 19 |
| Qcells | 0 | 9 | |
| SolarWorld | 0 | 4 | |
| Hyundai | 0 | 3 | |
| REC | 0 | 3 | |
| Inverter maker | SolarEdge | 0 | 42 |
| Enphase | 0 | 5 | |
| Fronius | 0 | 5 | |
| SMA | 0 | 2 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 53 of 54 installs, inverters on 54. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 885981 | GRIFFIN STEPHEN CONSTRUCTION INC (Corporation) | CLEAR | B General Building Contractor | Oct 19, 2006 | May 31, 2028 | 53 |
License numbers are the ones the utilities recorded on the interconnection applications (54 of 54 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 885981. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Steve Griffin Construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | 2021 | Total |
|---|---|---|---|---|---|---|
| unincorporated San Diego County | 885981 | 5 | 4 | 5 | 4 | 18 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- STEPHEN GRIFFIN CONSTRUCTION INC: 316 installs, license 885981
Counties
| County | Installs |
|---|---|
| Riverside | 21 |
| Orange | 17 |
| San Bernardino | 9 |
| San Diego | 5 |
| Los Angeles | 2 |
Top cities
| City | Installs |
|---|---|
| Borrego Springs | 17 |
| Blythe | 10 |
| Hesperia | 4 |
| Desert Hot Springs | 3 |
| Cathedral City | 2 |
| Fallbrook | 2 |
| Palm Springs | 2 |
| Twentynine Palms | 2 |
| Chula Vista | 1 |
| Downey | 1 |
| La Mesa | 1 |
| Lancaster | 1 |
| Murrieta | 1 |
| Perris | 1 |
| Phelan | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Steve Griffin Construction | 34 |
| STEVE GRIFFIN CONSTRUCTION | 13 |
| steve griffin construction | 6 |
| Steve griffin construction | 1 |
Common questions
Where does Steve Griffin Construction install solar?
Its installs are spread across 5 counties. The most are in Riverside County (21 installs), followed by Orange County (17).
How often does Steve Griffin Construction install batteries with solar?
3.1% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Steve Griffin Construction installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.