Sun First Solar

How many solar installs has Sun First Solar done in California, and which license number is on its installs?

Sun First Solar has 640 residential solar installs interconnected in California, active in the records from 2004 through 2021 (Feb 23, 2004 to Nov 3, 2021), most of them in Marin County (274), Sonoma County (92) and Alameda County (83). CSLB lists license 669250 (SUN FIRST! INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
640
Last 24 months
0
Total capacity
3,672.9 kW DC
Median system size
4.8 kW DC
With battery storage
1.3% all time; no installs in the last 24 months last 24 months
Third-party owned
2.3% of 640 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 15
First install
Feb 23, 2004
Latest install
Nov 3, 2021
Counties
18
Utilities
PGE 640
CSLB license
669250

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
2004160
200530
200600
2007320
2008260
2009300
2010220
2011160
201210
201300
2014620
20151380
20161230
2017570
2018560
2019556
202010
202122
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 640 interconnected installs with a tariff recorded (640) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.047273.8%not counted
NEM 2.016826.3%7 (4.2%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 15 of Sun First Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 15, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Sun First Solar exactly.

Third-party owner named on its installsInstalls
the solar quote15

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 627 of Sun First Solar’s 640 installs name a module maker in the “Generator Manufacturer” fields, and most of those (526, 83.9%) used modules recorded as SunPower.

Across all years, 640 of Sun First Solar’s 640 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (321, 50.2%) used inverters recorded as SunPower.

Across all years, 3 of Sun First Solar’s 640 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as Tesla.

3 of 8 battery-paired PG&E and SCE installs (37.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0526
BP Solar027
SolarWorld025
LG024
Sharp010
Inverter makerSunPower0321
SMA0206
SolarEdge039
Enphase027
Power-One021
Battery makerTesla02
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 627 of 640 installs, inverters on 640. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sun First Solar as developer on 0 battery storage projects and as installer on 23 (0 name it as both), 23 projects in all with 506 kWh of storage. 19 have the status Paid, with $140,104 in current incentive allocations. Applications were received from Jan 11, 2019 to Nov 30, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid19415$140,104
Cancelled254$16,857
RRF Rejected238$5,676

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage16346$86,50814$69,650
Large-Scale Storage370$17,6543$17,654
Equity Resiliency253$52,8002$52,800
Not stated238$5,6760$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
669250SUN FIRST! INC (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorApr 14, 1993Aug 31, 2027482

License numbers are the ones the utilities recorded on the interconnection applications (482 of 640 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 669250. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Sun First Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202220232026Total
City and County of San Francisco66925041010006
unincorporated Marin County669250152926281412115

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Marin274
Sonoma92
Alameda83
Contra Costa44
San Mateo36
Napa35
San Francisco21
Santa Clara17
Solano11
Lake8
San Joaquin7
Mendocino4
Butte2
Stanislaus2
Nevada1
Placer1
Sutter1
Tehama1

Top cities

CityInstalls
San Rafael54
Mill Valley45
Novato39
Oakland33
Santa Rosa30
Napa25
Berkeley23
San Anselmo21
San Francisco21
Sonoma20
Tiburon15
Kentfield14
Petaluma12
San Mateo12
Larkspur10

Names as recorded by the utilities

The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sun First Solar492
Sun First! Solar83
sun first solar50
Sun FIrst Solar7
Sun First ! Solar2
Sun First Solar!1
Sun First Solar.1
Sun first! Solar1
Sun First! Solar Inc1
Sun First! Solar.1
Sun First? Solar1

Common questions

Where does Sun First Solar install solar?

Its installs are spread across 18 counties. The most are in Marin County (274 installs), followed by Sonoma County (92).

How often does Sun First Solar install batteries with solar?

1.3% of its interconnected solar installs include battery storage across all years.

How many Sun First Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 640 interconnected installs with a tariff recorded (640) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.