Sunbrook Solar Power

How many solar installs has Sunbrook Solar Power done in California, and which license number is on its installs?

Sunbrook Solar Power has 134 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Mar 24, 2020 to May 12, 2026), most of them in San Diego County (98) and Orange County (36). CSLB lists license 1057369 (SUNBROOK SOLAR POWER & ELECTRICAL SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
134
Last 24 months
33
Total capacity
1,110.6 kW DC
Median system size
7.4 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 134 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
31 installs, latest May 12, 2026
Ownership types recorded
none recorded
First install
Mar 24, 2020
Latest install
May 12, 2026
Counties
2
Utilities
SDGE 134
CSLB license
1057369

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020210
2021210
2022250
2023260
2024160
2025170
2026 (through Aug 31, 2026)80

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

31 of its 134 interconnected installs (23.1% of the 134 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved May 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.010376.9%not recorded
Net Billing Tariff3123.1%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sunbrook Solar Power’s installs. No residential system in the file lists a third-party owner name that matches Sunbrook Solar Power exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 31 of Sunbrook Solar Power’s 33 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (9, 29.0%) used modules recorded as Qcells.

In the last 24 months, 33 of Sunbrook Solar Power’s 33 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (24, 72.7%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells957
Aptos Solar68
REC69
JA Solar4not in top list
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.3not in top list
Inverter makerTesla2433
Enphase629
SolarEdge363
Fronius12
ShenzhenLuxPowerTechnologyCo.,1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 115 of 134 installs, inverters on 134. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sunbrook Solar Power as developer on 8 battery storage projects and as installer on 3 (3 name it as both), 8 projects in all with 211 kWh of storage. 4 have the status Paid, with $86,980 in current incentive allocations. Applications were received from Feb 24, 2018 to Mar 4, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid4129$86,980
Cancelled483$38,829

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency393$92,4002$66,000
Small Residential Storage341$7,7361$2,036
Large-Scale Storage277$25,6731$18,944

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1057369SUNBROOK SOLAR POWER & ELECTRICAL SYSTEMS INC (Corporation)CLEARC-10 Electrical ContractorAug 23, 2019May 31, 2028134

License numbers are the ones the utilities recorded on the interconnection applications (134 of 134 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1057369. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Sunbrook Solar Power’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020202120222023202420252026Total
unincorporated San Diego County1057369912149157167

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego98
Orange36

Top cities

CityInstalls
Fallbrook51
San Clemente21
San Diego14
San Juan Capo9
Oceanside6
Carlsbad5
Bonsall3
Escondido3
Ladera Ranch3
Vista3
Capistrano Bch2
La Jolla2
Laguna Niguel2
Rancho Santa Fe2
San Marcos2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sunbrook Solar Power134

Common questions

Where does Sunbrook Solar Power install solar?

Its installs are spread across 2 counties. The most are in San Diego County (98 installs), followed by Orange County (36).

How often does Sunbrook Solar Power install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many Sunbrook Solar Power installs are under NEM 3.0 (the Net Billing Tariff)?

31 of its 134 interconnected installs (23.1% of the 134 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.