Sunnyside Solar Inc

How many solar installs has Sunnyside Solar Inc done in California, and which license number is on its installs?

Sunnyside Solar Inc has 113 residential solar installs interconnected in California, active in the records from 2015 through 2019 (Jul 23, 2015 to Sep 4, 2019), most of them in Los Angeles County (52), San Bernardino County (29) and Riverside County (25). The license number recorded on most of its installs, 1002414, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
113
Last 24 months
0
Total capacity
560.6 kW DC
Median system size
4.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
3.5% of 113 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 4
First install
Jul 23, 2015
Latest install
Sep 4, 2019
Counties
4
Utilities
SCE 112, SDGE 1
CSLB license
1002414

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015250
2016380
2017270
2018130
2019100
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 113 interconnected installs with a tariff recorded (113) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07768.1%not counted
NEM 2.03631.9%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 4 of Sunnyside Solar Inc’s installs the utility recorded a third-party ownership type: PPA 0, lease 4, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Sunnyside Solar Inc exactly.

Third-party owner named on its installsInstalls
Sunnova4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 113 of Sunnyside Solar Inc’s 113 installs name a module maker in the “Generator Manufacturer” fields, and most of those (59, 52.2%) used modules recorded as Renesola America.

Across all years, 113 of Sunnyside Solar Inc’s 113 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (37, 32.7%) used inverters recorded as ABB.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerRenesola America059
Qcells021
Canadian Solar018
SolarWorld013
Phono Solar Technology02
Inverter makerABB037
SolarEdge037
Fronius018
Enphase015
SMA06

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 113 of 113 installs, inverters on 113. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1002414Not found in the CSLB License Master file pulled Nov 4, 2026112

License numbers are the ones the utilities recorded on the interconnection applications (112 of 113 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles52
San Bernardino29
Riverside25
Orange7

Top cities

CityInstalls
Pomona9
Victorville8
Baldwin Park4
Long Beach4
Los Angeles4
Mira Loma4
Ontario4
Perris4
Riverside4
Chino3
Fontana3
Rialto3
Santa Ana3
Cathedral City2
Corona2

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sunnyside Solar Inc78
SUNNYSIDE SOLAR INC32
SUNNYSIDE SOLAR2
Sunnyside Solar1

Common questions

Where does Sunnyside Solar Inc install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (52 installs), followed by San Bernardino County (29).

How often does Sunnyside Solar Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sunnyside Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 113 interconnected installs with a tariff recorded (113) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.