SunOn Energy has 319 residential solar installs interconnected in California, active in the records from 2016 through 2023 (Feb 4, 2016 to Feb 28, 2023), most of them in Shasta County (137), Lake County (61) and Tehama County (60). The license number recorded on most of its installs, 1006917, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
319
Last 24 months
0
Total capacity
2,409.9 kW DC
Median system size
6.9 kW DC
With battery storage
1.6% all time; no installs in the last 24 months last 24 months
Third-party owned
5.0% of 319 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 4, lease 12
Median battery size
11.4 kWh (5 installs list a capacity)
First install
Feb 4, 2016
Latest install
Feb 28, 2023
Counties
16
Utilities
PGE 319
CSLB license
1006917, 1055525

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016450
2017530
2018710
2019690
2020613
2021182
202210
202310
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 319 interconnected installs with a tariff recorded (319) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04915.4%not counted
NEM 2.027084.6%5 (1.9%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 16 of SunOn Energy’s installs the utility recorded a third-party ownership type: PPA 4, lease 12, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SunOn Energy exactly.

Third-party owner named on its installsInstalls
Sunnova5
Sunlender3
Sun Lender2
Clean Power Finance1
Spruce1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 311 of SunOn Energy’s 319 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (92, 29.6%) used modules recorded as Silfab.

Across all years, 319 of SunOn Energy’s 319 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (109, 34.2%) used inverters recorded as Enphase.

Across all years, 3 of SunOn Energy’s 319 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as LG.

3 of 5 battery-paired PG&E and SCE installs (60.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab092
SolarWorld063
Qcells041
JinkoSolar037
Suniva022
Inverter makerEnphase0109
APsystems (Altenergy Power System)092
SolarEdge044
Fronius040
SunPower017
Battery makerLG02
Generac01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 311 of 319 installs, inverters on 319. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SunOn Energy as developer on 4 battery storage projects and as installer on 4 (4 name it as both), 4 projects in all with 68 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jul 1, 2020 to Nov 24, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled468$55,706

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency357$53,7360$0
Small Residential Storage111$1,9700$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1006917Not found in the CSLB License Master file pulled Nov 4, 2026193
1055525Not found in the CSLB License Master file pulled Nov 4, 2026125

License numbers are the ones the utilities recorded on the interconnection applications (319 of 319 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Shasta137
Lake61
Tehama60
San Joaquin19
Solano12
Butte10
Glenn7
Yolo3
Colusa2
Sonoma2
Alameda1
Lassen1
Mendocino1
Napa1
Placer1
Santa Clara1

Top cities

CityInstalls
Anderson52
Redding36
Red Bluff31
Cottonwood30
Kelseyville23
Lakeport18
Stockton14
Palo Cedro11
Corning10
Los Molinos7
Chico6
Clearlake Oaks6
Fairfield6
Burney4
Vacaville4

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SunOn Energy213
SUNON ENERGY CORPORATION103
Sunon Energy1
SunOn energy1
SunON Energy1

Common questions

Where does SunOn Energy install solar?

Its installs are spread across 16 counties. The most are in Shasta County (137 installs), followed by Lake County (61).

How often does SunOn Energy install batteries with solar?

1.6% of its interconnected solar installs include battery storage across all years.

How many SunOn Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 319 interconnected installs with a tariff recorded (319) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.