SUNRISE ENERGY GROUP INC

How many solar installs has SUNRISE ENERGY GROUP INC done in California, and which license number is on its installs?

SUNRISE ENERGY GROUP INC has 101 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Aug 7, 2015 to Aug 21, 2026), most of them in Los Angeles County (59), San Bernardino County (17) and Riverside County (9). CSLB lists license 1001447 (SUNRISE ENERGY GROUP INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
101
Last 24 months
80
Total capacity
664.3 kW DC
Median system size
6 kW DC
With battery storage
53.5% all time; 67.5% last 24 months
Third-party owned
7.9% of 101 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
80 installs, latest Aug 21, 2026
Ownership types recorded
PPA 6, lease 2
Median battery size
5 kWh (50 installs list a capacity)
First install
Aug 7, 2015
Latest install
Aug 21, 2026
Counties
8
Utilities
SCE 95, PGE 6
CSLB license
1001447

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201510
201650
201730
201850
201910
202050
202100
202200
202300
2024213
20253930
2026 (through Aug 31, 2026)2121

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

80 of its 101 interconnected installs (79.2% of the 101 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.098.9%not counted
NEM 2.01211.9%1 (8.3%)
Net Billing Tariff8079.2%53 (66.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 8 of SUNRISE ENERGY GROUP INC’s installs the utility recorded a third-party ownership type: PPA 6, lease 2, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SUNRISE ENERGY GROUP INC exactly.

Third-party owner named on its installsInstalls
Goodleap6
Sunrun2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 80 of SUNRISE ENERGY GROUP INC’s 80 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (18, 22.5%) used modules recorded as Axitec.

In the last 24 months, 80 of SUNRISE ENERGY GROUP INC’s 80 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (60, 75.0%) used inverters recorded as Enphase.

In the last 24 months, 54 of SUNRISE ENERGY GROUP INC’s 80 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (41, 75.9%) used batteries recorded as Enphase.

54 of 54 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAxitec1819
Phono Solar Technology1414
Qcells1414
Aptos Solar1111
Hyperion Solar6not in top list
Inverter makerEnphase6061
Tesla1313
APsystems (Altenergy Power System)66
SolarEdge322
SMA11
Battery makerEnphase4141
Tesla1313

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 101 of 101 installs, inverters on 101. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1001447SUNRISE ENERGY GROUP INC (Corporation)CLEARB General Building ContractorFeb 23, 2015Feb 28, 202797

License numbers are the ones the utilities recorded on the interconnection applications (99 of 101 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1001447. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles59
San Bernardino17
Riverside9
Orange5
Ventura5
Contra Costa4
Alameda1
Solano1

Top cities

CityInstalls
Lancaster6
Los Angeles5
Victorville5
Hesperia4
Lakewood4
Palmdale4
Compton3
Norwalk3
Pico Rivera3
Apple Valley2
Bell2
Calabasas2
Carson2
Diamond Bar2
Hacienda Heights2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNRISE ENERGY GROUP INC92
Sunrise Energy Group Inc8
Sunrise Energy Group inc1

Common questions

Where does SUNRISE ENERGY GROUP INC install solar?

Its installs are spread across 8 counties. The most are in Los Angeles County (59 installs), followed by San Bernardino County (17).

How often does SUNRISE ENERGY GROUP INC install batteries with solar?

53.5% of its interconnected solar installs include battery storage across all years, and 67.5% in the last 24 months (54 of 80).

How many SUNRISE ENERGY GROUP INC installs are under NEM 3.0 (the Net Billing Tariff)?

80 of its 101 interconnected installs (79.2% of the 101 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.