How many solar installs has Tag Construction Services done in California, and which license number is on its installs?

Tag Construction Services has 120 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Jul 27, 2016 to Jun 19, 2026), most of them in San Diego County (116) and Riverside County (4). CSLB lists license 557970 (TAG CONSTRUCTION SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
120
Last 24 months
7
Total capacity
754.3 kW DC
Median system size
5.7 kW DC
With battery storage
25.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 120 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest Jun 19, 2026
Ownership types recorded
none recorded
Median battery size
3.5 kWh (1 installs list a capacity)
First install
Jul 27, 2016
Latest install
Jun 19, 2026
Counties
2
Utilities
SDGE 116, SCE 4
CSLB license
557970

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201680
2017100
2018160
2019130
2020120
202180
2022160
2023260
202441
202540
2026 (through Aug 31, 2026)30

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 120 interconnected installs (8.3% of the 120 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jun 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011091.7%1 (25.0%)
Net Billing Tariff108.3%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Tag Construction Services’s installs. No residential system in the file lists a third-party owner name that matches Tag Construction Services exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Tag Construction Services’ 7 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 50.0%) used modules recorded as SOLAREVERTECNOLOGÍADEAMERICASADECV.

In the last 24 months, 7 of Tag Construction Services’ 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of Tag Construction Services’ 7 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSOLAREVERTECNOLOGÍADEAMERICASADECV33
Canadian Solar1not in top list
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.1not in top list
UnitedRenewableEnergyCo.,Ltd.19
Inverter makerEnphase7103
SMA1not in top list
Battery makerEnphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 112 of 120 installs, inverters on 120. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
557970TAG CONSTRUCTION SERVICES INC (Corporation)CLEARB General Building Contractor; C-39 Roofing ContractorFeb 22, 1989Sep 30, 2027120

License numbers are the ones the utilities recorded on the interconnection applications (120 of 120 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 557970. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Tag Construction Services’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212023Total
unincorporated San Diego County5579701332413

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego116
Riverside4

Top cities

CityInstalls
San Diego69
El Cajon8
Escondido8
Poway6
Lakeside4
Cardiff3
La Jolla3
Alpine2
Chula Vista2
La Mesa2
Murrieta2
Vista2
Encinitas1
Imperial Beach1
Oceanside1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Tag Construction Services116
TAG CONSTRUCTION SERVICES INC4

Common questions

Where does Tag Construction Services install solar?

Its installs are spread across 2 counties. The most are in San Diego County (116 installs), followed by Riverside County (4).

How often does Tag Construction Services install batteries with solar?

25.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Tag Construction Services installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 120 interconnected installs (8.3% of the 120 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.