Titan Solar Construction

How many solar installs has Titan Solar Construction done in California, and which license number is on its installs?

Titan Solar Construction has 61 residential solar installs interconnected in California, active in the records from 2015 through 2017 (May 14, 2015 to Feb 16, 2017), most of them in Los Angeles County (23), San Bernardino County (12) and Riverside County (9). The license number recorded on most of its installs, 962965, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
61
Last 24 months
0
Total capacity
337 kW DC
Median system size
5.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
16.4% of 61 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 8, prepaid lease 2
First install
May 14, 2015
Latest install
Feb 16, 2017
Counties
7
Utilities
SCE 55, PGE 6
CSLB license
962965

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015330
2016270
201710
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 61 interconnected installs with a tariff recorded (61) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06098.4%not counted
NEM 2.011.6%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 10 of Titan Solar Construction’s installs the utility recorded a third-party ownership type: PPA 0, lease 8, prepaid lease 2, other 0. No residential system in the file lists a third-party owner name that matches Titan Solar Construction exactly.

Third-party owner named on its installsInstalls
Sunpower9
SunPower Capital, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 61 of Titan Solar Construction’s 61 installs name a module maker in the “Generator Manufacturer” fields, and most of those (45, 73.8%) used modules recorded as SolarWorld.

Across all years, 61 of Titan Solar Construction’s 61 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (42, 68.9%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld045
SunPower015
Suniva01
Inverter makerSolarEdge042
ABB05
Enphase05
Power-One05
SMA04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 61 of 61 installs, inverters on 61. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
962965Not found in the CSLB License Master file pulled Nov 4, 202661

License numbers are the ones the utilities recorded on the interconnection applications (61 of 61 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles23
San Bernardino12
Riverside9
Kern8
Orange6
Ventura2
Tulare1

Top cities

CityInstalls
Bakersfield5
San Bernardino4
Corona2
Moreno Valley2
Santa Ana2
Westminster2
Agoura Hills1
Alta Loma1
Apple Valley1
Baldwin Park1
Bellflower1
Buena Park1
California City1
Compton1
Duarte1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Titan Solar Construction61

Common questions

Where does Titan Solar Construction install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (23 installs), followed by San Bernardino County (12).

How often does Titan Solar Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Titan Solar Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 61 interconnected installs with a tariff recorded (61) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.