UniverCity Solar

How many solar installs has UniverCity Solar done in California, and which license number is on its installs?

UniverCity Solar has 328 residential solar installs interconnected in California, active in the records from 2017 through 2025 (Jan 10, 2017 to Aug 27, 2025), most of them in San Bernardino County (140), Orange County (78) and San Diego County (66). CSLB lists license 1014033 (UNIVERCITY SOLAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
328
Last 24 months
2
Total capacity
2,295.9 kW DC
Median system size
6.6 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 328 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Aug 27, 2025
Ownership types recorded
none recorded
First install
Jan 10, 2017
Latest install
Aug 27, 2025
Counties
10
Utilities
SCE 207, SDGE 117, PGE 4
CSLB license
1014033

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017350
2018500
2019860
2020950
2021190
2022140
2023250
202430
202510
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 328 interconnected installs (1.5% of the 328 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 27, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0123.7%not counted
NEM 2.031194.8%0 (0.0%)
Net Billing Tariff51.5%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on UniverCity Solar’s installs. No residential system in the file lists a third-party owner name that matches UniverCity Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of UniverCity Solar’s 2 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as JA Solar.

In the last 24 months, 2 of UniverCity Solar’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar1not in top list
LONGi14
Inverter makerEnphase2316

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 328 of 328 installs, inverters on 328. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1014033UNIVERCITY SOLAR ELECTRIC (Limited Liability)CLEAR, FAM Sup Tmp LicC-10 Electrical ContractorMay 11, 2016Mar 31, 2027328

License numbers are the ones the utilities recorded on the interconnection applications (328 of 328 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1014033. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list UniverCity Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201920202025Total
unincorporated San Diego County10140331214

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino140
Orange78
San Diego66
Riverside20
Los Angeles17
Fresno2
Kern2
Lake1
Tulare1
Ventura1

Top cities

CityInstalls
Ladera Ranch54
Apple Valley31
Hesperia26
Laguna Niguel26
Barstow22
Victorville15
Mission Viejo14
San Bernardino9
Las Flores5
Rch Msn Viejo5
Corona4
Coto de Caza4
Helendale4
Laguna Hills4
Rancho Santa Margarita4

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
UNIVERCITY SOLAR LLC189
UniverCity Solar120
UniverCity Solar LLC11
univercity solar6
univercity solar LLC2

Common questions

Where does UniverCity Solar install solar?

Its installs are spread across 10 counties. The most are in San Bernardino County (140 installs), followed by Orange County (78).

How often does UniverCity Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many UniverCity Solar installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 328 interconnected installs (1.5% of the 328 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.