UNIVERCITY SOLAR ELECTRIC

How many solar installs has UNIVERCITY SOLAR ELECTRIC done in California, and which license number is on its installs?

UNIVERCITY SOLAR ELECTRIC has 638 residential solar installs interconnected in California, active in the records from 2016 through 2025 (Aug 13, 2016 to Jun 23, 2025), most of them in San Bernardino County (439), Riverside County (88) and Orange County (50). CSLB lists license 1014033 (UNIVERCITY SOLAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
638
Last 24 months
61
Total capacity
5,308.6 kW DC
Median system size
8 kW DC
With battery storage
18.8% all time; 83.6% last 24 months
Third-party owned
0.0% of 638 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
135 installs, latest Jun 23, 2025
Ownership types recorded
none recorded
Median battery size
10.1 kWh (119 installs list a capacity)
First install
Aug 13, 2016
Latest install
Jun 23, 2025
Counties
9
Utilities
SCE 636, PGE 2
CSLB license
1014033

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
201780
201810
201910
202010
2021980
20221780
202322819
20249883
20252418
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

135 of its 638 interconnected installs (21.2% of the 638 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.7% of those include battery storage. The latest Net Billing Tariff install was approved Jun 23, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.081.3%not counted
NEM 2.049577.6%7 (1.4%)
Net Billing Tariff13521.2%113 (83.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on UNIVERCITY SOLAR ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches UNIVERCITY SOLAR ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 61 of UNIVERCITY SOLAR ELECTRIC’s 61 installs name a module maker in the “Generator Manufacturer” fields, and most of those (47, 77.0%) used modules recorded as LONGi.

In the last 24 months, 61 of UNIVERCITY SOLAR ELECTRIC’s 61 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (60, 98.4%) used inverters recorded as Enphase.

In the last 24 months, 51 of UNIVERCITY SOLAR ELECTRIC’s 61 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (50, 98.0%) used batteries recorded as Enphase.

120 of 120 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi4752
Canadian Solar10377
Qcells3182
Aptos Solar11
Inverter makerEnphase60341
Tesla130
Battery makerEnphase50119
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 612 of 638 installs, inverters on 638. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1014033UNIVERCITY SOLAR ELECTRIC (Limited Liability)CLEAR, FAM Sup Tmp LicC-10 Electrical ContractorMay 11, 2016Mar 31, 2027638

License numbers are the ones the utilities recorded on the interconnection applications (638 of 638 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1014033. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list UNIVERCITY SOLAR ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201920202025Total
unincorporated San Diego County10140331214

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino439
Riverside88
Orange50
Los Angeles47
Kern6
Ventura4
Tulare2
San Joaquin1
Santa Barbara1

Top cities

CityInstalls
Apple Valley113
Hesperia74
Victorville56
Yucaipa31
Barstow29
Mission Viejo13
Murrieta12
Oak Hills11
Phelan11
Redlands10
San Bernardino10
Alta Loma9
Fontana8
Helendale8
Rialto8

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
UNIVERCITY SOLAR ELECTRIC411
univercity solar electric219
UniverCity Solar Electric7
Univercity Solar Electric1

Common questions

Where does UNIVERCITY SOLAR ELECTRIC install solar?

Its installs are spread across 9 counties. The most are in San Bernardino County (439 installs), followed by Riverside County (88).

How often does UNIVERCITY SOLAR ELECTRIC install batteries with solar?

18.8% of its interconnected solar installs include battery storage across all years, and 83.6% in the last 24 months (51 of 61).

How many UNIVERCITY SOLAR ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

135 of its 638 interconnected installs (21.2% of the 638 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.