Valley Pacific Builders, Inc. dba Pacifi

How many solar installs has Valley Pacific Builders, Inc. dba Pacifi done in California, and which license number is on its installs?

Valley Pacific Builders, Inc. dba Pacifi has 415 residential solar installs interconnected in California, active in the records from 2009 through 2023 (Feb 19, 2009 to Jun 21, 2023), most of them in Fresno County (315), Madera County (41) and Tulare County (36). CSLB lists license 812149 (PACIFIC SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
415
Last 24 months
0
Total capacity
3,278 kW DC
Median system size
7.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
7.5% of 415 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 31
First install
Feb 19, 2009
Latest install
Jun 21, 2023
Counties
8
Utilities
PGE 377, SCE 38
CSLB license
812149

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200940
201050
2011210
2012480
2013340
2014370
2015600
2016560
2017540
2018410
2019510
202030
202100
202200
202310
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 415 interconnected installs with a tariff recorded (415) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.027165.3%not counted
NEM 2.014434.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 31 of Valley Pacific Builders, Inc. dba Pacifi’s installs the utility recorded a third-party ownership type: PPA 0, lease 31, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Valley Pacific Builders, Inc. dba Pacifi exactly.

Third-party owner named on its installsInstalls
SunPower Capital LLC22
Sunpower Solar Program I, LLC5
SunPower Corporation3
Sunpower Solar Program l, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 395 of Valley Pacific Builders, Inc. dba Pacifi’s 415 installs name a module maker in the “Generator Manufacturer” fields, and most of those (381, 96.5%) used modules recorded as SunPower.

Across all years, 415 of Valley Pacific Builders, Inc. dba Pacifi’s 415 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (316, 76.1%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0381
Suntech05
SolarWorld04
Canadian Solar02
Suniva02
Inverter makerSunPower0316
SolarEdge053
SMA044
Fronius04
Enphase03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 395 of 415 installs, inverters on 415. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Valley Pacific Builders, Inc. dba Pacifi as developer on 9 battery storage projects and as installer on 9 (9 name it as both), 9 projects in all with 12,225 kWh of storage. 3 have the status Paid, with $7,679 in current incentive allocations. Applications were received from Dec 17, 2019 to Sep 9, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid339$7,679
PBI in Process1223$189,550
Cancelled411,952$2,060,400
RRF Rejected111$2,289

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage411,952$2,060,4000$0
Small Residential Storage339$7,6793$7,679
Non-Residential Storage Equity1223$189,5500$0
Not stated111$2,2890$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
812149PACIFIC SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorAug 30, 2002Aug 31, 2028298

License numbers are the ones the utilities recorded on the interconnection applications (300 of 415 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 812149. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Fresno315
Madera41
Tulare36
Kings15
Merced4
Mariposa2
Kern1
San Luis Obispo1

Top cities

CityInstalls
Fresno176
Clovis89
Madera25
Visalia19
Kingsburg14
Sanger14
Chowchilla9
Hanford7
Reedley7
Lemoore6
Tulare5
Fowler4
Kerman4
Porterville4
Atwater3

Names as recorded by the utilities

The utilities recorded this installer under 27 spellings. The 25 most common are shown. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Valley Pacific Builders, Inc. dba Pacifi189
Valley Pacific Builders Inc. DBA Pacific Solar88
Valley Pacific Builders, Inc., dba Pacif23
Valley Pacific Builders, Inc. dba Pacific Solar18
Valley Pacific Builders DBA Pacific Sola17
Valley Pacific Builders13
Valley Pacific Builders dba Pacific Sola10
Valley Pacific Builders, Inc. DBA Pacifi9
Valley Pacific Builders Inc., dba Pacifi8
Valley Pacific Builders Inc., dba Pacific Solar8
VALLEY PACIFIC BUILDERS INC6
Valley Pacific Builders, Inc DBA Pacific5
Valley Pacific Builders, Inc., dba Pacific Solar5
Valley Pacific Builders Inc dba Pacific2
Valley Pacific Builders, Inc dba Pacific2
VAlley Pacific Builders1
Valley Pacific Builders DBA Pacifc Solar1
valley Pacific Builders DBA Pacific Sola1
Valley pacific Builders DBA Pacific Sola1
VALLEY PACIFIC BUILDERS DBA PACIFIC SOLA1
Valley Pacific Builders Inc, DBA Pacific Solar1
Valley Pacific Builders Inc. dba Pacific1
Valley Pacific Builders, Inc Dba Pacific1
Valley Pacific Builders, INC DBA Pacific1
Valley Pacific Builders, Inc.1

Common questions

Where does Valley Pacific Builders, Inc. dba Pacifi install solar?

Its installs are spread across 8 counties. The most are in Fresno County (315 installs), followed by Madera County (41).

How often does Valley Pacific Builders, Inc. dba Pacifi install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Valley Pacific Builders, Inc. dba Pacifi installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 415 interconnected installs with a tariff recorded (415) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.