Vision Installation

How many solar installs has Vision Installation done in California, and which license number is on its installs?

Vision Installation has 270 residential solar installs interconnected in California, active in the records from 2014 through 2015 (May 16, 2014 to Dec 11, 2015), most of them in Contra Costa County (173), Solano County (60) and San Joaquin County (14). CSLB lists license 853582 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
270
Last 24 months
0
Total capacity
1,263 kW DC
Median system size
4.4 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.4% of 269 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 1
First install
May 16, 2014
Latest install
Dec 11, 2015
Counties
13
Utilities
PGE 269, SCE 1
CSLB license
853582

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
20142130
2015570
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 270 interconnected installs with a tariff recorded (270) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0270100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Vision Installation’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Vision Installation exactly.

Third-party owner named on its installsInstalls
Sunnova1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 266 of Vision Installation’s 270 installs name a module maker in the “Generator Manufacturer” fields, and most of those (157, 59.0%) used modules recorded as Canadian Solar.

Across all years, 270 of Vision Installation’s 270 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (139, 51.5%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar0157
Trina Solar0109
Inverter makerSMA0139
SolarEdge0133
Enphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 266 of 270 installs, inverters on 270. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
853582Sole owner license (name not shown)CLEARC-10 Electrical ContractorJan 25, 2005Jan 31, 2027266

License numbers are the ones the utilities recorded on the interconnection applications (266 of 270 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 853582. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Contra Costa173
Solano60
San Joaquin14
Alameda6
Butte6
Napa3
San Mateo2
El Dorado1
Merced1
Riverside1
San Francisco1
Yolo1
Yuba1

Top cities

CityInstalls
Antioch50
Vacaville39
Brentwood36
Pittsburg20
Concord19
Oakley18
Fairfield9
Suisun City8
Byron6
Stockton6
Oroville5
Walnut Creek5
Clayton4
Danville4
Discovery Bay4

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Vision Installation268
VISION INSTALLATION LLC1
Vision Installation, LLC1

Common questions

Where does Vision Installation install solar?

Its installs are spread across 13 counties. The most are in Contra Costa County (173 installs), followed by Solano County (60).

How often does Vision Installation install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Vision Installation installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 270 interconnected installs with a tariff recorded (270) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.