Vision Solar
How many solar installs has Vision Solar done in California, and which license number is on its installs?
Vision Solar has 879 residential solar installs interconnected in California, active in the records from 2014 through 2018 (Mar 12, 2014 to Aug 22, 2018), most of them in Contra Costa County (272), Riverside County (159) and San Bernardino County (98). CSLB lists license 853582 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to Vision Solar here carry more than one CSLB license number: 853582 on 690 (CSLB holder Sole owner license (name not shown)) and 1027027 on 10 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 879
- Last 24 months
- 0
- Total capacity
- 4,945.8 kW DC
- Median system size
- 5.2 kW DC
- With battery storage
- 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
- Third-party owned
- 63.8% of 865 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 453, lease 6, other 93
- First install
- Mar 12, 2014
- Latest install
- Aug 22, 2018
- Counties
- 22
- Utilities
- PGE 418, SCE 411, SDGE 50
- CSLB license
- 853582, 1027027
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2014 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2014 | 150 | 0 |
| 2015 | 139 | 0 |
| 2016 | 377 | 0 |
| 2017 | 210 | 0 |
| 2018 | 3 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 879 interconnected installs with a tariff recorded (879) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 740 | 84.2% | not counted |
| NEM 2.0 | 139 | 15.8% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 552 of Vision Solar’s installs the utility recorded a third-party ownership type: PPA 453, lease 6, prepaid lease 0, other 93. Across all installers, 11 residential systems list a third-party owner name that matches Vision Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Sunnova | 331 |
| Sunnova Energy Corporation | 53 |
| Dividend Loan | 39 |
| Envision | 39 |
| Envision Loan | 29 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 842 of Vision Solar’s 879 installs name a module maker in the “Generator Manufacturer” fields, and most of those (464, 55.1%) used modules recorded as Silfab.
Across all years, 879 of Vision Solar’s 879 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (694, 79.0%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Silfab | 0 | 464 |
| Trina Solar | 0 | 188 | |
| Canadian Solar | 0 | 182 | |
| SolarWorld | 0 | 2 | |
| Yingli | 0 | 2 | |
| Inverter maker | Enphase | 0 | 694 |
| SMA | 0 | 129 | |
| SolarEdge | 0 | 62 | |
| Power-One | 0 | 16 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 842 of 879 installs, inverters on 879. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 853582 | Sole owner license (name not shown) | CLEAR | C-10 Electrical Contractor | Jan 25, 2005 | Jan 31, 2027 | 690 |
| 1027027 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 10 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (709 of 879 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 853582. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- Ion Solar: 275 installs, license 853582
- Vision Installation: 270 installs, license 853582
- Zing Solar: 813 installs, license 1027027
- Ion Solar: 275 installs, license 1027027
- ION Developer LLC: 60 installs, license 1027027
Counties
| County | Installs |
|---|---|
| Contra Costa | 272 |
| Riverside | 159 |
| San Bernardino | 98 |
| Los Angeles | 62 |
| Ventura | 50 |
| San Diego | 47 |
| Orange | 30 |
| San Joaquin | 29 |
| Butte | 25 |
| Solano | 24 |
| Napa | 17 |
| Kern | 15 |
| Alameda | 13 |
| Merced | 11 |
| Santa Clara | 8 |
| Sonoma | 5 |
| Fresno | 4 |
| Tulare | 3 |
| El Dorado | 2 |
| Marin | 2 |
| Stanislaus | 2 |
| Calaveras | 1 |
Top cities
| City | Installs |
|---|---|
| Antioch | 102 |
| Pittsburg | 47 |
| Camarillo | 34 |
| Concord | 30 |
| Oakley | 25 |
| Cathedral City | 24 |
| Corona | 24 |
| Oroville | 24 |
| Oceanside | 19 |
| Riverside | 18 |
| Mira Loma | 17 |
| Ontario | 17 |
| Brentwood | 16 |
| Fontana | 15 |
| Napa | 15 |
Names as recorded by the utilities
The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Vision Solar | 716 |
| Vision Solar, LLC | 145 |
| VISION SOLAR LLC | 7 |
| Vision Solar LLC | 5 |
| VISION SOLAR | 2 |
| VIsion Solar | 1 |
| Vision solar, LLC | 1 |
| VISION SOLAR, LLC | 1 |
| Vision Solar. LLC | 1 |
Common questions
Where does Vision Solar install solar?
Its installs are spread across 22 counties. The most are in Contra Costa County (272 installs), followed by Riverside County (159).
How often does Vision Solar install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Vision Solar installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 879 interconnected installs with a tariff recorded (879) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.