Zing Solar

How many solar installs has Zing Solar done in California, and which license number is on its installs?

Zing Solar has 813 residential solar installs interconnected in California, active in the records from 2013 through 2018 (Oct 18, 2013 to Nov 2, 2018), most of them in San Diego County (785), Orange County (13) and Riverside County (11). The license number recorded on most of its installs, 987260, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
813
Last 24 months
0
Total capacity
3,914.3 kW DC
Median system size
4.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
80.0% of 451 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 269, lease 9, prepaid lease 1, other 82
First install
Oct 18, 2013
Latest install
Nov 2, 2018
Counties
6
Utilities
SDGE 797, SCE 16
CSLB license
987260, 1027027

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
2013140
20142140
20151940
20162440
20171410
201860
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 813 interconnected installs with a tariff recorded (813) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.056769.7%not counted
NEM 2.024630.3%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 361 of Zing Solar’s installs the utility recorded a third-party ownership type: PPA 269, lease 9, prepaid lease 1, other 82. Across all installers, 191 residential systems list a third-party owner name that matches Zing Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Zing Solar191
Sunnova113
Ion Solar47
Zingsolar6
Hero1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 780 of Zing Solar’s 813 installs name a module maker in the “Generator Manufacturer” fields, and most of those (506, 64.9%) used modules recorded as Trina Solar.

Across all years, 813 of Zing Solar’s 813 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (811, 99.8%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar0506
LG0256
Silfab012
SolarWorld05
Suniva01
Inverter makerEnphase0811
PV Powered02
SMA02
SolarEdge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 780 of 813 installs, inverters on 813. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
987260Not found in the CSLB License Master file pulled Nov 4, 2026244
1027027Not found in the CSLB License Master file pulled Nov 4, 202628

License numbers are the ones the utilities recorded on the interconnection applications (273 of 813 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
San Diego785
Orange13
Riverside11
Los Angeles2
Santa Barbara1
Ventura1

Top cities

CityInstalls
San Diego316
Chula Vista160
Santee46
El Cajon38
Escondido38
San Marcos32
Lakeside20
Spring Valley18
Oceanside17
La Mesa16
Vista14
National City13
Lemon Grove8
Bonita7
San Clemente7

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Zing Solar810
ZING SOLAR3

Common questions

Where does Zing Solar install solar?

Its installs are spread across 6 counties. The most are in San Diego County (785 installs), followed by Orange County (13).

How often does Zing Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Zing Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 813 interconnected installs with a tariff recorded (813) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.