WESTERN ELECTRICAL COMPANY

How many solar installs has WESTERN ELECTRICAL COMPANY done in California, and which license number is on its installs?

WESTERN ELECTRICAL COMPANY has 42 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Apr 18, 2022 to Feb 18, 2026), most of them in Fresno County (25), Kings County (11) and Tulare County (3). CSLB lists license 910714 (WESTERN ELECTRICAL COMPANY LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
42
Last 24 months
8
Total capacity
412.7 kW DC
Median system size
9 kW DC
With battery storage
14.3% all time; 75.0% last 24 months
Third-party owned
0.0% of 42 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Feb 18, 2026
Ownership types recorded
none recorded
Median battery size
9.3 kWh (5 installs list a capacity)
First install
Apr 18, 2022
Latest install
Feb 18, 2026
Counties
6
Utilities
PGE 28, SCE 14
CSLB license
910714

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022150
2023130
202492
202532
2026 (through Aug 31, 2026)22

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 42 interconnected installs (28.6% of the 42 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Feb 18, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.03071.4%0 (0.0%)
Net Billing Tariff1228.6%6 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on WESTERN ELECTRICAL COMPANY’s installs. No residential system in the file lists a third-party owner name that matches WESTERN ELECTRICAL COMPANY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 8 of WESTERN ELECTRICAL COMPANY’s 8 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 50.0%) used modules recorded as JA Solar.

In the last 24 months, 8 of WESTERN ELECTRICAL COMPANY’s 8 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 6 of WESTERN ELECTRICAL COMPANY’s 8 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 100.0%) used batteries recorded as Enphase.

6 of 6 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar44
Qcells318
Phono Solar Technology17
Inverter makerEnphase837
Battery makerEnphase66

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 42 of 42 installs, inverters on 42. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
910714WESTERN ELECTRICAL COMPANY LLC (Limited Liability)CLEARC-10 Electrical ContractorFeb 15, 2008Jun 30, 202742

License numbers are the ones the utilities recorded on the interconnection applications (42 of 42 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 910714. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno25
Kings11
Tulare3
Madera1
Merced1
San Luis Obispo1

Top cities

CityInstalls
Fresno16
Hanford11
Clovis5
Sanger3
Visalia2
Atwater1
Cayucos1
Kingsburg1
Madera1
Tulare1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
WESTERN ELECTRICAL COMPANY29
WESTERN ELECTRICAL COMPANY LLC11
Western Electrical Company2

Common questions

Where does WESTERN ELECTRICAL COMPANY install solar?

Its installs are spread across 6 counties. The most are in Fresno County (25 installs), followed by Kings County (11).

How often does WESTERN ELECTRICAL COMPANY install batteries with solar?

14.3% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (6 of 8).

How many WESTERN ELECTRICAL COMPANY installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 42 interconnected installs (28.6% of the 42 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.