Win-Dor, Inc. has 34 residential solar installs interconnected in California, active in the records from 2009 through 2014 (Oct 5, 2009 to Dec 31, 2014), most of them in Orange County (12), Riverside County (12) and Los Angeles County (5). The license number recorded on most of its installs, 545553, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
34
Last 24 months
0
Total capacity
167 kW DC
Median system size
4.3 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
32.3% of 31 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 10
First install
Oct 5, 2009
Latest install
Dec 31, 2014
Counties
5
Utilities
SCE 32, SDGE 2
CSLB license
545553

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200970
201050
201150
2012130
201330
201410
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 34 interconnected installs with a tariff recorded (34) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.034100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 10 of Win-Dor, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 10, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Win-Dor, Inc. exactly.

Third-party owner named on its installsInstalls
SunPower Solar Program I, LLC8
SunPower Capital, LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 2 of Win-Dor, Inc.’s 34 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as SunPower.

Across all years, 32 of Win-Dor, Inc.’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (29, 90.6%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower02
Inverter makerSunPower029
ABB01
Power-One01
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2 of 34 installs, inverters on 32. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
545553Not found in the CSLB License Master file pulled Nov 4, 202631

License numbers are the ones the utilities recorded on the interconnection applications (31 of 34 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Orange12
Riverside12
Los Angeles5
San Bernardino3
San Diego2

Top cities

CityInstalls
Corona9
Lake Forest2
Los Alamitos2
Tustin2
Villa Park2
Alta Loma1
Cypress1
Diamond Bar1
Escondido1
Glendora1
Huntington Beach1
La Verne1
Long Beach1
Murrieta1
Norco1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Win-Dor, Inc.27
WIN-DOR, INC.6
WIN-DOR INC1

Common questions

Where does Win-Dor, Inc. install solar?

Its installs are spread across 5 counties. The most are in Orange County (12 installs), followed by Riverside County (12).

How often does Win-Dor, Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Win-Dor, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 34 interconnected installs with a tariff recorded (34) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.