ZURC POWER SOLUTIONS INC

How many solar installs has ZURC POWER SOLUTIONS INC done in California, and which license number is on its installs?

ZURC POWER SOLUTIONS INC has 47 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Aug 4, 2021 to Apr 14, 2026), most of them in Santa Clara County (27), San Joaquin County (8) and San Mateo County (4). CSLB lists license 1077597 (ZURC POWER SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
47
Last 24 months
6
Total capacity
345.3 kW DC
Median system size
7.8 kW DC
With battery storage
10.6% all time; 83.3% last 24 months
Third-party owned
0.0% of 47 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Apr 10, 2026
Ownership types recorded
none recorded
First install
Aug 4, 2021
Latest install
Apr 14, 2026
Counties
7
Utilities
PGE 47
CSLB license
1077597

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202180
2022190
2023140
202400
202533
2026 (through Aug 31, 2026)32

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 47 interconnected installs (6.4% of the 47 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04493.6%2 (4.5%)
Net Billing Tariff36.4%3 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ZURC POWER SOLUTIONS INC’s installs. No residential system in the file lists a third-party owner name that matches ZURC POWER SOLUTIONS INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of ZURC POWER SOLUTIONS INC’s 6 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 40.0%) used modules recorded as REC.

In the last 24 months, 6 of ZURC POWER SOLUTIONS INC’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 83.3%) used inverters recorded as Enphase.

In the last 24 months, 3 of ZURC POWER SOLUTIONS INC’s 6 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as FranklinWH.

3 of 5 battery-paired PG&E and SCE installs (60.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC23
Hyundai1not in top list
JA Solar1not in top list
SunPower1not in top list
Inverter makerEnphase543
FranklinWH33
SunPower1not in top list
Battery makerFranklinWH22
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 44 of 47 installs, inverters on 47. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ZURC POWER SOLUTIONS INC as developer on 12 battery storage projects and as installer on 11 (11 name it as both), 12 projects in all with 1,325 kWh of storage. 4 have the status Paid, with $96,316 in current incentive allocations. Applications were received from Nov 13, 2023 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid4137$96,316
Reserved3110$110,200
Pending Reservation115$40,913
Cancelled41,063$984,970

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency81,171$1,169,3063$82,716
Small Residential Storage285$8,5800$0
Large-Scale Storage154$13,6001$13,600
Residential Solar and Storage Equity - AB 209 Non-POU115$40,9130$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1077597ZURC POWER SOLUTIONS INC (Corporation)CLEARC-10 Electrical ContractorJun 29, 2021Jun 30, 202747

License numbers are the ones the utilities recorded on the interconnection applications (47 of 47 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1077597. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Clara27
San Joaquin8
San Mateo4
Alameda3
Merced3
Fresno1
San Benito1

Top cities

CityInstalls
San Jose19
Los Banos3
Manteca3
Stockton3
Campbell2
Hayward2
Lodi2
Los Altos2
Cupertino1
Fresno1
Gilroy1
Hollister1
Menlo Park1
Morgan Hill1
Mountain View1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ZURC POWER SOLUTIONS INC47

Common questions

Where does ZURC POWER SOLUTIONS INC install solar?

Its installs are spread across 7 counties. The most are in Santa Clara County (27 installs), followed by San Joaquin County (8).

How often does ZURC POWER SOLUTIONS INC install batteries with solar?

10.6% of its interconnected solar installs include battery storage across all years, and 83.3% in the last 24 months (5 of 6).

How many ZURC POWER SOLUTIONS INC installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 47 interconnected installs (6.4% of the 47 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.